Since the start of the 2026 school year, children in Pratteln, Switzerland, have been learning and playing in a new timber building by Brandenberger Kloter Architekten. Kindergarten Aegelmatt brings a kindergarten and a day-care centre together under one roof. The façades of untreated timber change with the weather, the light and the seasons, making the passing of time visible to the children.
Commissioned by the Municipality of Pratteln, the two-storey replacement building responds to a neighbourhood that is now home to far more children than before. It is the first step in the renewal of the Aegelmatt school complex from 1971; the school building and gymnasium will be renovated in a second phase. The brief asked for more space, a layout that supports contemporary learning and play, and a building that needs little technology and can be adapted later.
The building is conceived as a timber structure. The load-bearing exterior walls in timber-frame construction were prefabricated and assembled within a few weeks; inside, columns and beams carry the loads, and the interior walls are non-load-bearing. The plinth is made of concrete. Continuous ribbon windows translate the language of the neighbouring school building into the present. The structure remains visible inside: timber columns and galvanised cross bracing articulate the corridor, low washbasins line the wall, and ceilings of wood-wool panels absorb sound. In the cloakroom, timber benches, rows of hooks and open shelves give each child a place of their own, at the children's scale. On the upper floor, the building opens onto a terrace of around 70 m², framed by timber slats and a slatted deck.
"Children experience architecture with all their senses. We wanted to build a house that does not stay perfect but shows how time passes. The untreated timber will change, and the children can watch it happen," says Oliver Brandenberger.
Large windows bring plenty of daylight inside, and solar shading prevents overheating in summer. Through the clerestory windows, the rooms can be cross-ventilated and flushed with fresh air at night; no mechanical ventilation or cooling is needed. A solar installation on the extensive green roof generates electricity, heating is provided by district heating, and the building follows the Swiss Sustainable Building Standard (SNBS).
"For us, building sustainably means not only making the most of the potential of the site, but also including light, air and thermal currents in the design process. A well-considered concept of load-bearing and non-load-bearing walls makes it possible to adapt or combine the rooms later. If required, the kindergarten can also be extended by an additional storey," says Adrian Kloter.
The ground floor houses three kindergartens, each with its own group room, cloakroom, storage room and WC, as well as a room for inclusive support. On the upper floor, the Fita day-care centre has rooms for play, rest, movement and crafts, as well as a kitchen. The building provides space for 72 kindergarten children and 100 children in day care.
Client: Municipality of Pratteln (Einwohnergemeinde Pratteln). Architecture: Brandenberger Kloter Architekten, Basel. Project lead: Adrian Kloter. General contractor, site management and timber construction: Husner AG Holzbau, Frick. Landscaping: Werkhof, Municipality of Pratteln. Signage: Lengsfeld Designkonzepte, Basel. Photographs © Willem Pab. Plans © brandenbergerkloter.
Project page: https://www.brandenbergerkloter.ch/bauten/kindergarten-aegelmatt-pratteln.