This three-classroom addition to McKee Public School was constructed in 2025. Originally built in 1998, the school expanded in 2015 with a two-room Kindergarten. Due to site constraints, the addition was built on top of the Kindergarten extension, seamlessly integrated with the existing second floor.
This project employs prefabrication and modular construction methods aimed at achieving efficient and high-quality results. The primary goal of utilizing these building techniques is to significantly reduce on-site construction activities, thereby minimizing disruption to ongoing school operations.
This case study highlights the strategic use of prefabrication and modularity as a rapid delivery construction method to existing building contexts.
Due to its astute usage of modular construction, the McKee Public School addition was awarded an Honorable Mention in 2026 by the Modular Building Institute, for Permanent Modular Education under 10,000 sq.ft.