The largest and most significant office development to date for King’s Cross in London

The contemporary building provides 400,000 sq ft of modern office space with flexible floorplates and is now the primary office location for Meta employees in the UK. 

photo_credit Hufton + Crow
Hufton + Crow

The development is divided into four large facets that follow the curve of the site. It is heavily influenced by the industrial heritage of the extensive railway development on its western boundary. The building’s distinctive façade features two layers: a cladding of bronzed anodised aluminium panels sits behind bronze anodised aluminium louvres that are perforated. Together, they reflect the building’s scale and emphasise the curved perspectives along Canal Reach in both distant and near views.

photo_credit Hufton + Crow
Hufton + Crow

Sustainability has been integral to the project from start to completion. The building utilises passive design principles wherever possible and digital modelling was carried out on the façade to refine the shading requirements for each block in an iterative process. 

photo_credit Hufton + Crow
Hufton + Crow

In addition to an embodied carbon assessment, the building has been awarded a BREEAM ‘Outstanding’ rating, exceeding its original target. It is also connected to the King’s Cross District Energy Network meaning it will benefit from zero carbon heating, hot water and cooling. The King’s Cross District Energy Network is powered by 100% renewable energy sources.

photo_credit Hufton + Crow
Hufton + Crow
photo_credit Hufton + Crow
Hufton + Crow

 

Project credits

Landscape Architects
Contractors
Engineers

Project data

Project Year
2021
Primary Building Material
Other
Steel
Building Area
55500 m2