Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

New standards for project delivery

Ordsall Chord is a vital new rail connection between Piccadilly, Oxford Road and Victoria Stations in Manchester. Completed in 2018 as part of commissioning client Network Rail’s ‘Northern Hub’ Scheme, the £32m viaduct links the three stations for the first time and provides significant improvements in network capacity, resilience and connectivity.

The weathering steel rail viaduct culminates in the dramatic River Irwell crossing, a distinctive network arch whose curvaceous form swoops below deck level to engage with a new public realm landscape. Winner of the RIBA North West Building of the Year 2019, the dramatic design has been acclaimed for its catalytic effect on the disused post-industrial setting and its detailed execution.

Knight Architects worked with the AECOM Mott MacDonald JV in order to deliver BDP’s original design, ensuring that the construction methodology and detailing is in keeping with their original concept, emphasising the River Irwell Crossing as a new landmark whilst acknowledging the historic sensitivity of Stevenson’s Bridge nearby.

Project credits

Architects
Contractors
Contractors

Project data

Project Year
2018
Category
Bridges
Share or Add Ordsall Chord to your Collections