THE NEST

Applied products
View all applied products

The pre-war development of the parcels was shaped according to the 18th century concept of urban development, also called the Stanislawowska Axis. It was one of the key urban layouts of Warsaw, modelled on the French spatial arrangements. The concept was laid out by king Stanislaw August Poniatowski who by means of a series of star-shaped squares wished to connect the then city of Warsaw with his suburban residence in Ujazdow. Based on the existing King’s Road leading to the election grounds of Wola, a series of squares was designed, such as Na Rozdrożu, Zbawiciela, Politechniki or UniiLubelskiej, along with the streets stretching from each of these squares. A geometrical grid of streets - some of them intersecting at sharp angles within the squares - is one of the most characteristic elements of this historical layout. Thus shaped parcels of land, completely built-up, formed narrow corner plots, defining the frontages of squares and street intersections. Koszykowa Street was planned according to such an urban development concept.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

A triangular parcel of land located on the corner of two streets (at the site of the planned investment) used to house a four-storey building erected before 1900, whose rising façades formed a narrow corner with an additional dominant feature in the form of a lantern. The plot has retained its original shape from 1876, however, the building did not survive the war. 

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

The site of the planned development, with its historical background, was a place of great importance for the Metropolitan Monument Conservator Office, to be built up with respect for the original urban layout. Consultations began in 2011 and involved the Minister of Culture and National Heritage himself. Three years later, the architectural design was complemented with the official Metropolitan Monument Conservator Office recommendations. Although it is the urban area that falls under the conservator’s protection, the guidelines, apart from strict requirements regarding the building’s size, shape and height, also included the following clause: “The Metropolitan Monument Conservator also recommends that the new building that will become the most noticeable element of the corner of Koszykowa and Piekna Streets, be as “light” and as much glazed as possible”.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

The Decision on Land Development and Management Conditions was written in a similar vein and defined the future building as a construction with the ground floor walls within the  boundaries of the investor’s plot and 1.5 m overhangs in the width of the right-of-way of the neighbouring streets at the first floor level. The overhangs reiterate the protruding bays and balconies of nearby tenement houses, thus shaping the frontage of both streets. The Decision on Land Development and Management Conditions also specified the maximum height of the façade as 27 m up to the main cornice, i.e. the edge of the rooftop terrace – the upper boundary of the overhang located directly over the pavement.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

The shape of the plot – 9.90 m maximum width,  3 m wide at the intersection – strongly determined the future design concept. The plot is 35 m long. Local zoning conditions allowed to increase the outline of the building by means of the overhangs at the first floor level, located directly over the pavement. This, however, did not significantly affect the length to width ratio of the planned development.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

In the course of the designing process further restrictions were imposed on the building form. After an in-depth analysis of the utility infrastructure it turned out that practically every municipal utility system crossed the site of the planned development. Teletechnical infrastructure proved to be the most problematic as it could not be moved. As a result, the ground floor wall had to be pushed 6 m further back from the street intersection, which generated new challenges for the designers – the length of the front overhang had to change from 1.5 m to 7.5 m. In order to maintain vertical clearance at the intersection of the streets, the overhang needed to be appropriately contoured so as not to cause collisions of the vehicles turning either into Piekna Street or Koszykowa Street. The wall at the intersection was sloped, which increased the floor plan proportionally to the height of the building. In the final design the overhang is 4.40 m at the ground floor level, gaining additional 3 m at the top of the slant.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Structural columns within the ground floor plan carry the weight of the roof overhang support structures. The issue becomes more complex when it comes to the cantilever at the street intersection: a vertical pillar was used in the corner (10 m from the end of the cantilever) with another one slanting from the edge of the ground floor towards the top of the overhang. The vertical and diagonal pillars are bound together by the consecutive floor slabs. Reinforced concrete slabs on the lower floors are suspended on steel cables installed in the corners of the building.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Over the years there have been countless design concept changes and numerous changes to the building’s function; however, a fresh perspective was necessary when approaching the project. Eventually, taking into account the aspect of the building’s functionality, two underground floors were designed to house technical facilities. Part of the -1 floor, together with the ground floor and floors above the ground (except for the top floor) contain commercial space (mixed use office and retail). The top seventh floor is taken up by an apartment with a conservatory in the street intersection area and a spacious rooftop terrace. Small technical space is also located on the roof. The circulation core of the building comprising the elevators is located in the widest part of the plot, by the gable wall. The building core additionally holds most of the technical maintenance facilities. Due to the height restrictions imposed on the building, the concept of dropped ceilings had to be abandoned and all installations spread from hubs in the raised floors.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Organizing the construction site proved to be quite a challenge – the overhangs rising over the pavements, the construction site on a small, undeveloped parcel of land, squeezed between another construction site and a tenement house in Koszykowa Street. Everything required a great deal of precision and planning. Concrete delivered to the site in a concrete mixer had to be used immediately, as there was no parking space for the truck.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Construction actually started in May 2016 with digging a 2-storey deep and 10 m narrow excavation. The underground part could not exceed the boundaries of the investor’s plot. The objective was to provide as much space inside the building as possible, therefore the construction of walls required a great deal of precision. The original design had to be reviewed following a comprehensive inventory of the utility infrastructure around the plot. The excavation was shored using a soldier pile wall (Berlin wall) with the objective of filling it with concrete later on and making it the core of the underground wall. As some of the municipal utility systems crossing the plot were disconnected in time with the ground works, work on the building was further impeded by the pipes and cables hanging in the excavation.

Nevertheless, construction work went smoothly and concrete slab ceilings rose gradually towards the sky. The body of the building acquired shape. Around this stage first elevation mock-ups appeared on the façades, made of glass that was either less or more reflective. The transparency of the glass strongly affected the thermal comfort inside the building, so decisions had to be made very rationally, based on a series of calculations and building expertise. The air pocket between the glass and a reinforced concrete beam separating the storeys was also a problem, as the heated air from inside the building tended to accumulate there. Eventually, a decision was made to choose the type of glass that would allow to see not just the interior of the building, but also street frontages behind it.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

For such a complex structure the construction process went relatively fast. Subtle changes in the building form needed to be precisely moulded in concrete. The finished reinforced concrete skeleton ideally filled the empty space. From that moment on the daily progress of the works was not so clearly visible and a long, tedious process of installing glazed elevation began. The aluminium profiles are fastened to perimeter beams of each floor by means of special hooks made of adjustable steel rods. Their even distribution required a great deal of discipline and precision; mistakes would result in an undulating façade.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

The means of architectural expressions were basically derived from the concept of “lightness” recommended by the Metropolitan Monument Conservator Office. The building form is characterized by an overhang just 2.55 m from the level of the pavement. The resulting structure naturally divides the building into two parts.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

A monolithic, matt, dark, stone (Brazilian Black Jack slate) core of the staircase spans the building from the ground floor and reaches high above the rooftop. This particular element is closed and opaque in character, and provides a striking contrast with the second, compositionally different part of the building. It also harmoniously separates the designed construction from potential future development on the neighbouring parcel of land.        

The second part of the building is a glazed overhang divided into 3 segments at the 2nd and 3rd floor level, respectively. It forms a light, translucent element that on the one hand exposes the building’s interior and on the other reflects the surrounding tenement houses and the “Koszyki” Market Hall opposite. Subtle shifts of the glass panels in relation to one another allow the street onlooker to admire the reflections of the local architecture at different angles.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Such an approach to elevation design allows the new building to harmoniously complement its demanding surroundings. The design concept brings out the best both in the neighbouring buildings and original local urban layout. The offset glass boxes differ in their external finish, which is particularly visible when looking at the building lit up by the sun from the perspective of street intersections.

photo_credit Mikołaj Lelewski
Mikołaj Lelewski

Material Used :
1. Reynaers Aluminium / Curtain Wall CW50. CW50-SC
2. Guardian Glass / Guardian Sunguard Superneutral SN 62/34
3. Kamieniarz Tadeusz Modliński / brasilianslate Jack Black
4. Alucobond Dibond / Aluminium Composite Mirror Range
5. Geze / all-glass door system SGG

Caption
Caption

The Nest

Applied products
View all applied products

Learn from the past and build a brighter future: a very fitting motto to live by in architecture. The Nest’s tall and slender design, for instance, is a nod to the original narrow corner plots of the city of Warsaw, Poland. Only three metres wide at the base of its front façade, the prominent office building looks as light as a feather. Reynaers Aluminium curtain wall solutions create this marvellous urban mirror you just cannot look away from.


With its length of 27 metres, fully clad with glass panels, The Nest both stands out of and fits in with the city’s street plan perfectly. Overhangs at the ground floor keep the intersection of the two flanking streets visible for all traffic. Visibility is an important factor for Piotr Bzdel, project architect for Grupa 5 Architekci: “Subtle shifts in the glass panels allow you to admire the reflections of the local architecture at different angles. The tall and tilted façades reflect the surrounding building in a surprising way.”

 

"Subtle shifts in the glass panels allow you to admire the reflections of the local architecture at different angles." - Piotr Bzdel, Grupa 5 Architekci

 

The tall and tilted façades reflect the surrounding architecture beautifully from whichever angle you approach them.
The Nest is as transparent as it is reflective, a light bubble and a solid mirror in one. Architect Bzdel explains how he created the lightness in the building’s design: “Our approach to elevation design allows projects to perfectly complement their surroundings, while being an entity of their own. For example, The Nest’s offset glass boxes alternate in their external finish, which is clearly visible when you look at the building in the sunlight.” The result: a visual spectacle.

 

For the curtain wall glazing, the architects selected the Reynaers Aluminium ConceptWall 50-High Insulation (HI) system. The even distribution of profiles in the design required a great deal of installation precision. But thanks to our quality solution, the front façade features bigger profiles at the street intersection, while more slender profiles cover the sides of the building.

Warsaw is known for its warm summers and ice-cold winters and to cope with the variation in temperature, you need highly insulating elements. Luckily, next to our curtain wall products, the Nest features ConceptPatio 155 sliding solutions and ConceptSystem 86-High Insulation (HI) doors. Heat and cold are kept outside while the systems’ burglar-proof features create a safe and comfortable office space. With the help of Reynaers Aluminium, The Nest will remain a prominent eye-catcher for many years to come.

Brand description

Reynaers Aluminium is a leading European specialist in the development and marketing of innovative and sustainable aluminium solutions for windows, doors, curtain walling, sliding systems, sunscreening and conservatories. Besides offering an extensive range of standard solutions, the company also develops solutions that are tailored to an individual project. Research, product development and testing are conducted at the Reynaers Institute, the sector’s largest private innovation and testing centre, located in Duffel (Belgium). In addition, the company also provides extensive technical support and advice to fabricators, contractors and architects.

Reynaers Aluminium is the market leader in Belgium and has acquired a strong market position in the 30 countries where it has its own sites. The company’s success is due to the close partnership between Reynaers and 5,000 partner fabricators, architects and project developers worldwide. This reliable and inspiring partnership is expressed by the baseline Together for Better. In 2025 the Reynaers group achieved a turnover of 711 million euros and it has over 2,500 employees throughout the world. The company exports to more than 70 countries on 5 continents.

www.reynaers.com

Products applied in Commercial , Cultural , Educational , +4
Share or Add THE NEST to your Collections