Kulturhalle Christoph Willibald Gluck
KÜHNLEIN Architektur

Berching Culture Hall

Kühnlein Architektur como Arquitetos

Urban planning:
After an intensive search for a new location for the replacement building for the culture factory in Berching, an inner-city area with vacant buildings was acquired by the city of Berching.

By dismantling the existing hotel building from the 1980s, the valuable inner-city area on the Sulz was reorganized. In addition to the medieval hospital building, the Hotel Post's new beer garden also forms the forecourt to the new Berching cultural hall and is therefore an area that is always lively. The renovation of the Hotel Post, the redesign of the sulz-shore  and the new culture hall will create an attractive space in Berching in the middle of the historic old town.

Architecture and construction:
The building with its steep gable roof takes up the traditional features of the historic barns and reinterprets them. The timber comes exclusively from the city's own forest. For this purpose, spruce was used as construction wood for the roof and gable surfaces and a grid made of black pine for the facade cladding.

The woods are treated with a traditional, non-toxic quark-casein coating.
The flanking side wing with flat roof is subordinate to the gable roof structure and contains the ancillary rooms such as sanitary facilities, kitchen and storage rooms. The side wing is made of concrete for fire protection reasons. These exposed concrete surfaces provide a striking contrast to the wooden construction. The sanitary rooms are deliberately sparse and sober with stainless steel items and slim mirrors with simple lights.

The entire interior design is deliberately designed plain and simple with inexpensive materials. The herringbone cladding in the hall with different proportions of joints serves the room acoustics and regulates the reverberation time. At the same time, it serves to stiffen the roof and wall surfaces.

The hall with stage and backstage area offers space for various seating and event variants. The stage is connected to the level of the hall and basement with a lifting platform.

The dimmable chandeliers with industrial fluorescent tubes were designed by KÜHNLEIN Architekur for the project.

Products Behind Projects
Product Spotlight
Notícias
10 homes making use of straw bale construction and insulation
3 mai. 2024 Especificação
10 casas que utilizam a construção e o isolamento com fardos de palha

A palha tem uma longa história como material de construção, encontrando aplica&... Mais

ATP architects engineers completes office building in line with “New Work” principles and sustainability goals
3 mai. 2024 Notícia
ATP architects engineers conclui edifício de escritórios em conformidade com os princípios da "Obra Nova" e os objectivos de sustentabilidade

ATP architects engineers concluiu um edifício operacional e de escritórios sustent&aac... Mais

SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport
2 mai. 2024 Notícia
SOM conclui “terminal num jardim” no Aeroporto Internacional Kempegowda de Bengaluru

A empresa internacional e interdisciplinar de arquitetura, design e engenharia Skidmore, Owings &... Mais

Archello houses of the month - April 2024
1 mai. 2024 Notícia
Casas Archello do mês - abril de 2024

A Archello seleccionou as suas casas do mês para abril de 2024. Esta lista apresenta 20 das ca... Mais

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
30 abr. 2024 Notícia
O Centro de Arte Cívica de Zhuhai Jinwan, dos arquitectos Zaha Hadid, faz eco dos padrões chevron das aves migratórias

Desenhado por Zaha Hadid Architects, o Zhuhai Jinwan Civic Art Centre é definido pelas linhas... Mais

25 best metal cladding manufacturers
2 mai. 2024 Especificação
25 melhores fabricantes de revestimentos metálicos

O revestimento metálico pode combinar a funcionalidade com a estética, ao mesmo tempo... Mais