TOY LIBRARY AND OFFICES IN EXISTING BUILDING
Adrià Goula

Toy Library And Offices In Existing Building

Taller 9S arquitectes como Arquitectos

Recycling city

An obsolete 'corner' of Barcelona's Gothic Quarter is recycled, to transform an existing disused building into a public building that profit from the potential of the site to generate urbanity.


Liberating the Gothic bell tower

With the demolition of part of the existing building it is retrieved the Gothic bell tower of the church of Santa Maria del Pi, freeing it from the current tensions and creating a patio at its feet, future access to the interior of the urban block.


Old bay- New body

It's been rehabilitated the first bay of the existing building to maintain the historic character of the old square. And it's been built a new body behind the old structure, a new building with zinc skin and metal structure which dialogues with the old part and frees the tower.


The tower as a backdrop

The new part of the building gesticulates and dematerializes to face the tower and the masonry of the tower becomes the fourth facade in all floors.


A mirror facades

The facade of the new body which is situated opposite the tower becomes a contemporary reinterpretation of the old Gothic. Stony walls, massive, are transmuted into a semi-transparent skin of vertical slats, the lines of imposts are now metal profiles…


Air and light as hinges

Between the new and the old, a gap of light and air links all floors and visually extends the outside to inside. The old part on the ground floor overlooks the square favouring close proximity between urban citizens and new uses.


Container of social uses

The logistics spaces and the scale are placed adjacent to a narrow private street. The remaining space is freed allowing multiple uses. In the same way that in the old part all the offices open to the square, in the new part the spaces face the tower.


Innovative construction process

The structural framework was built before the deconstruction of the building in order to hold the buildings nearby. Afterwards it is been worked simultaneously on the finishing of the upper floors and in the archaeological works on the ground floor with the aim of lowering a subterranean floor. This strategy allowed to shorten the period of works 4 months.

 

A Place, then a construction system

Metal structure, ventilated facade, dry partitions, panels of resins, rubber flooring, stucco traditional cal ... The building systems are designed to meet both the difficulties and the demands of the site waste minimization, energy efficiency, durability and the easy maintenance.

Créditos Del Proyecto
Hoja De Especificaciones Del Producto

ElementoMarca
Construction companyTEYCO
Hoja De Especificaciones Del Producto
Construction company
por TEYCO
Project Spotlight
Product Spotlight
Noticias
EovaStudio uses Baguette Oval glazed terracotta facade from Tempio in sports pavilion renovation
7 nov. 2024 Noticias
EovaStudio utiliza la fachada de terracota esmaltada Baguette Oval de Tempio en la renovación de un pabellón deportivo

El estudio de arquitectura sevillano EovaStudio ha renovado y mejorado un pabellón deportivo... Más

Porseleinen Hof by Orange Architects connect modern architecture with the city’s industrial past
6 nov. 2024 Noticias
Porseleinen Hof, de Orange Architects, conecta la arquitectura moderna con el pasado industrial de la ciudad

Porseleinen Hof, de Orange Architects, es una innovadora urbanización de Delft (Países... Más

Primary school in Au, Austria by Bernardo Bader Architekten recalls traditional approach to building in wood
6 nov. 2024 Noticias
La escuela primaria de Au (Austria), diseñada por Bernardo Bader Architekten, recupera el enfoque tradicional de la construcción en madera.

El estudio de arquitectura austriaco Bernardo Bader Architekten ha terminado una nueva escuela prima... Más

25 best track light manufacturers
5 nov. 2024 Especificación
25 mejores fabricantes de luces de riel

Los raíles luminosos son sistemas de iluminación versátiles que ofrecen una ilu... Más

Mixed wood and concrete production hall in Austria nestles neatly in a picturesque village setting
4 nov. 2024 Noticias
Una nave de producción mixta de madera y hormigón en Austria se integra en el pintoresco entorno de un pueblo

DI Simon Moosbrugger Architekt ZT ha diseñado una nueva nave de producción para la emp... Más