Crac Building
Charlotte Lamby

Crac Building

ArcelorMittal Construction en tant que Fabricants.

Crac" is a public management body located in the heart of the city. The project involved renovating the building's envelope for energy efficiency and aesthetics, while maintaining its activity. In the end, the operation reduced the building's energy consumption for heating and cooling by more than 10 times! By way of comparison, this performance is now better than that required for a new building.

 

The construction concept was based on a simple idea: to wrap the entire building in a new prefabricated insulating skin without touching the existing façade. This proposal means that employees can remain in the building, while avoiding the costs of moving twice and having to stop work.

photo_credit Charlotte Lamby
Charlotte Lamby

After digitally scanning all the facades, several dozen prefabricated wooden panels were fixed to the existing balconies in the workshop, enabling the entire volume to be covered in just a few days.

 

All the building's new technology was placed in the gap created between the old and new facades, so that the occupants could continue to work in the best possible conditions.

 

The existing façade was dismantled and removed as soon as the new façade was in place and operational.

photo_credit Charlotte Lamby
Charlotte Lamby

The project also gives the building a new, contemporary architectural expression that is fully consistent with its construction system. The materials used are simple and light, highlighting the connections between the panels.

 

The contrast between the aluminium and the yellow colour highlights the entrance system and the sunbreakers.

 

The interior of the skin, which is in contact with the building's interior spaces, is warmer: the interior fir wood finishes contrast with the technological character of the exterior façade, giving the spaces a soothing dimension.

 

The construction of a series of furniture units integrated into the façade takes advantage of the interstitial space, offering occupants new storage facilities.

photo_credit Charlotte Lamby
Charlotte Lamby

System: Eclectic 50
Coating: Krystal
Architect: URBAN Architectes
Cladding installation partner: Habemo
Photographer: Charlotte Lamby

Products Behind Projects
Product Spotlight
News
Batlleiroig recovers and improves historic promenade in Reus
25 juil. 2024 Nouvelles
Batlleiroig récupère et améliore la promenade historique de Reus

Batlleiroig, un studio multidisciplinaire de planification, d'aménagement paysager et d'archi... En savoir plus

MVRDV imagines mixed-use Pixel development in Abu Dhabi as an oyster
24 juil. 2024 Nouvelles
MVRDV imagine le développement mixte de Pixel à Abu Dhabi comme une huître

L'agence internationale d'architecture MVRDV a achevé Pixel, un projet de développemen... En savoir plus

Atelier L’Abri’s design for minimal wooden pavilion embraces sustainable regeneration and self-sufficiency
23 juil. 2024 Nouvelles
Le projet de pavillon en bois minimal de l'Atelier L'Abri s'inscrit dans une démarche de régénération durable et d'autosuffisance.

Le studio d'architecture et de construction montréalais Atelier L'Abri a achevé le Pav... En savoir plus

Seattle’s Maritime Innovation Center: A catalyst for the Blue Economy
22 juil. 2024 Nouvelles
Centre d'innovation maritime de Seattle : Un catalyseur pour l'économie bleue

Le port de Seattle a récemment donné le coup d'envoi du nouveau centre d'innovation ma... En savoir plus

Monumental sculptures appear to embrace and support Fragment Apartments in Prague
22 juil. 2024 Nouvelles
Des sculptures monumentales semblent étreindre et soutenir les appartements Fragment à Prague

Le studio créatif QARTA Architektura, basé à Prague, a achevé le d&eacut... En savoir plus

Key recent projects by Baumschlager Eberle Architekten
22 juil. 2024 Nouvelles
Principaux projets récents de Baumschlager Eberle Architekten

Baumschlager Eberle Architekten est un bureau d'architecture international réputé pour... En savoir plus