DE STEK in Groningen

DE STEK in Groningen
Images courtesy: Haskoning / De Stek

Adaptive reuse of a technical school into a contemporary workplace for collaboration in Groningen

Applied products
View all applied products

DE STEK in Groningen is a transformation of a former 1980s technical school into a contemporary, energy-efficient workplace. Designed by Haskoning, the renovation upgraded the building from an energy label G to A++++, representing a significant improvement in environmental performance for an existing structure of this scale.

With a floor area of approximately 4,008 square meters, the project demonstrates how adaptive reuse and targeted building upgrades can reduce operational energy demand while extending the lifespan of an existing building.

photo_credit Images courtesy: Haskoning / De Stek
Images courtesy: Haskoning / De Stek

The complex provides approximately 6,300 square meters of workspace organised on a single level. Office units range from 27 to 220 square meters and are complemented by shared facilities including flexible workspaces, meeting rooms, a brasserie, and a fitness centre.

The STEKroom, a digital presentation and event space, accommodates seminars and lectures. Informal and quirky meeting spaces are integrated throughout the interior, including a refurbished double-decker bus and an American school bus positioned within the lobby.

Applied Products block will be inserted here

A collaborative workplace environment

DE STEK functions as a workplace community for companies engaged in innovation and regional development in the northern Netherlands. The tenant mix is intentionally diverse, with one organisation represented per sector to encourage collaboration rather than competition within the building.

Prospective tenants meet with a building council before joining to ensure alignment with the project’s shared ambitions. Through this selection process, DE STEK brings together organisations contributing to economic and social development within the Groningen region.

photo_credit Images courtesy: Haskoning / De Stek
Images courtesy: Haskoning / De Stek

Location and accessibility

The project is located at Euvelgunnerweg 25a in Groningen on a site of approximately 15,000 square meters. The campus includes landscaped outdoor areas, 107 on-site parking spaces, and 97 bicycle parking spaces. Twenty electric vehicle charging points support low-emission mobility.

The building is accessible by multiple modes of transport. The southern ring road lies approximately 400 metres from the site, while Groningen Central Station can be reached within a ten-minute bicycle ride. Public transport connections are also available, with bus line 12 stopping directly in front of the building.

High-performance building envelope

The project's transformation from energy label G to A++++ is achieved through a combination of envelope upgrades, system replacement, and on-site renewable energy generation. A central component of the renovation was the improvement of the building envelope to reduce heating and cooling demand. The roof, façades, and floors were insulated to improve thermal performance. The roof insulation was increased by an additional 21 centimetres on top of the existing 7-centimetre layer.

All windows were replaced with HR++ and triple glazing to improve energy efficiency and interior comfort. The large skylights that characterise the building were also upgraded with new glazing, allowing daylight to penetrate deep into the interior while limiting heat loss. These measures enhance thermal stability and reduce operational energy requirements.

Caption

Energy-efficient building systems

Following the renovation, DE STEK operates entirely without natural gas. Heating and cooling are provided by water-to-water heat pumps connected to vertical ground heat exchangers, enabling the building to use geothermal energy for thermal regulation. Renewable electricity is generated on-site through approximately 1,000 photovoltaic panels installed on the roof. Together with the geothermal system, the solar installation supports the building’s fully electric energy strategy.

Additional energy reductions are achieved through upgraded building systems and operational strategies. All lighting has been replaced with LED fixtures equipped with presence detection, ensuring that lighting is used only when required. The upgraded roof glazing improves natural daylight levels throughout the interior, reducing reliance on artificial lighting during daytime hours. These measures contribute to lower electricity consumption and improved operational efficiency.

The building’s sustainability improvements were independently assessed by Ecocert, which awarded DE STEK an A++++ energy label. The certification reflects the comprehensive insulation strategy, the integration of renewable energy systems, and the transition to an all-electric building infrastructure.

Caption

Resources and circularity

The project’s approach to material use is defined primarily by retention and reuse. The existing structural frame, much of the building envelope, and approximately half of the internal partition walls were preserved, reducing the need for new materials and associated embodied carbon.

Envelope improvements were integrated into the existing structure, including additional insulation layers and the installation of triple glazing within existing window frames. Several internal elements, such as mezzanine floors, were also retained. Floor finishes were minimised by omitting additional screed layers, reducing material use and construction impact.

At the tenant level, the workplace fit-out extends circular principles. Existing partition walls, window frames, and office furniture were reused where possible. Operational choices also contribute to reduced material impact, including the use of reusable or recycled products such as closed-loop coffee cups and low-impact catering strategies.

photo_credit Images courtesy: Haskoning / De Stek
Images courtesy: Haskoning / De Stek

Landscape design and ecological integration

The sustainability strategy extends beyond the building to the surrounding landscape. The garden around DE STEK was redeveloped to introduce additional greenery and create an accessible outdoor space for employees, visitors, and neighbours. The site connects to the nearby Hunze zone, a restored ecological corridor within Groningen that supports biodiversity and water management across the region.

The landscape improvements were realised with support from the Entrepreneurs Fund Groningen, the Municipality of Groningen, and companies located within DE STEK and the surrounding Zuid Oost industrial estate. Future plans include the addition of an orangery, providing a sheltered outdoor environment for meetings, informal gatherings, and seasonal use. Two professionally maintained beehives have also been installed within the garden, supporting pollination and contributing to urban biodiversity.

Caption

Adaptive reuse and long-term flexibility

Adaptive reuse is central to the project’s environmental strategy. By transforming a vacant technical school into a contemporary office environment, the project avoids impacts associated with demolition and new construction while extending the building’s functional lifespan. The single-level layout and modular office units allow for reconfiguration over time, supporting changing tenant needs. At both building and tenant levels, shared services and flexible spatial organisation contribute to a resource-efficient and adaptable workplace model, aligned with long-term sustainability objectives.

photo_credit Images courtesy: Haskoning / De Stek
Images courtesy: Haskoning / De Stek

Social sustainability and shared values

The workplace concept incorporates social sustainability alongside environmental performance. Shared facilities and collective services reduce duplication of resources while supporting interaction between tenants. Spaces such as the “Mixed Zone” are designed to encourage informal exchange across different organisations.

Operational practices also reflect inclusive principles. Cleaning and catering services involve workers with labour-market disadvantages and differently-abled staff, embedding social value within day-to-day building operations.

Indoor environmental quality is supported through improved insulation, glazing, and ventilation, combined with consistent daylight access. Outdoor areas provide additional space for relaxation and informal use. Mobility infrastructure—including bicycle parking with showers and electric vehicle charging—supports active and low-emission commuting.

Caption

Project credits

Architects and Engineers

Sustainability

Dutch Energy Performance Certificate • Energy Label A++++
2024
Low Carbon
Embodied carbon
Paris Proof
Operational Emissions / Energy
Efficient
Service and maintenance emissions
1
Key Low-Carbon Products

Project data

Project Year
2020
Category
Offices
Building Area
6300 m2
Share or Add DE STEK in Groningen to your Collections