Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

Le Parc

Located along the bustling Wisconsin Avenue corridor and adjacent to the iconic National Cathedral, the original historic house on this site had gradually lost its connection to the Cleveland Park Historic District and was falling into disrepair.  The underlying multifamily zoning offered an opportunity for increased density and height, but the house, a contributing structure to the historic district, could not be demolished.

photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski

Through a deep analysis of the property, a solution emerged: relocating and rotating the historic house within the same lot.  This restoration effort not only reestablished the house's connection to the historic context of the residential Macomb Street but also created a new development parcel to continue the urban experience along Wisconsin Avenue all while bringing new housing units to a desired neighborhood.

photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski

Utilizing the site's potential density, the new apartment building effectively borrowed the air rights of the house to accommodate a vertical tower containing eight residential units.  This innovative approach addresses the need for housing in a coveted location previously occupied by a single-family dwelling, while maintaining important historic fabric.

photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski
photo_credit Kate Wichlinski
Kate Wichlinski

Incorporating sustainable practices was paramount to the project. The design integrated high-efficiency heat pump systems, stormwater bio-retention areas, intensive green roofs, and a high-performance exterior envelope.

Caption
Caption

Project credits

Product spec sheet

Windows
Contemporary series by PELLA CORPORATION
Metal Panel
Brick

Project data

Project Year
2024
Primary Building Material
Brick
Building Area
17600 sq ft
Share or Add Le Parc to your Collections