Object Baesweiler

Object Baesweiler: Renovation of a gym at a high school in Baesweiler


The structural height of the floor in six large changing rooms, two small changing rooms, three shower rooms, a machine room, a caretaker’s room, the so-called ‘boot corridor’ and a small WC only allowed the use of vacuum insulation in order to be able to provide a level transition to the so-called ‘gym shoe corridor’. One difficulty was that most of the rooms had floor drains and these needed to continue to be used for drainage. Measurement of these floor drains allowed exact planning and the creating of a laying plan.