Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

St. Denis Catholic School

St. Denis Catholic School
A-Frame Photography

St. Denis Catholic School

Our sculptural addition to this elementary school, which extends out from the second storey to hover above the playground, accommodates a new library and creates a sheltered environment at grade for students that is both functional and whimsical.

photo_credit Shai Gill
Shai Gill
photo_credit Shai Gill
Shai Gill
photo_credit Shai Gill
Shai Gill

Our design for the addition at St. Denis Catholic School was driven by two key factors: the building’s orientation on the site and spatial constraints related to the property’s small lot size and steeply sloped incline. In order to work with these restrictions, preserve the existing play area, and bypass the logistical complexities of an at-grade addition, which would have compromised the classroom layout in the original building, we arrived at a creative solution: expand the second-storey library and use the surplus existing space to accommodate the new classroom requirements, ancillary spaces, and the corridors required to access the addition. 

photo_credit Shai Gill
Shai Gill
photo_credit Shai Gill
Shai Gill
photo_credit Shai Gill
Shai Gill

Featuring integrated seating, a wood skin, and an elongated column, the exterior elements of the addition are part of the play space while the interior houses a new library and learning space. Two long bands of windows stretch across the curvilinear body, allowing light to pour into the classrooms. At the elevated level, students have a clear view of the treeline that surrounds the property, reinforcing a connection with nature throughout the day. 

photo_credit Shai Gill
Shai Gill

To address the soil conditions and support this second-floor addition, we used deep helical pier foundations to avoid the time and cost required to undertake a large-scale excavation and underpinning of the existing building. In order to install new structural steel and reinforce the foundation of an occupied building, we took great care to devise a phasing and exiting strategy in one wing of the school to minimize disruptions to students, circulation, and the daily school schedule.

photo_credit Lisa Logan
Lisa Logan
photo_credit Lisa Logan
Lisa Logan
Share or Add St. Denis Catholic School to your Collections