Temporary extension Olympic Stadium Amsterdam
PIAA Delft

Temporary extension Olympic Stadium Amsterdam

Tom Bergevoet Architecture as Architects

The Physical Planning Department of Amsterdam and the Amsterdam Olympic Stadium Foundation consider reusing its former Olympic Stadium (1928), in case large scale sport events will be organized in the Netherlands like the European Championship Athletics (2016), the World Championships Soccer (2018) or the Olympic Games (2028). Therefore, the city invited two Amsterdam based architectural offices, na-ma architecture & tom bergevoet architecture, to cooperate on a design for a temporary extension of the monumental stadium. There are two motives for the temporariness of this extension. Since the stadium is a monument, renovated by the Dutch renovation architect André van Stigt, any extension of its capacity has to be temporary, independent and easy to disassembly. Furthermore, the city wants to avoid a "White Elephant". The extra capacity is only needed for the sport-events and will be redundant right after the events.


The architects designed two extension models. The base for the first model is a rather compact extension unit with 2.000 seats. With this unit, the stadium can be extended in steps of 2.000 seats to a maximum of 22.000 extra seats (total stadium-capacity 44.000 seats). The extension unit enables several scenarios for a temporary enlargement of the stadium. By adding 3 of these units, the capacity can be reached necessary to organize the European Championship Athletics. By adding another 7 units, the required size of a stadium for the World Championships Soccer is realized. The size of the compact extension unit is determined by the monumental higher elements of the stadium, that should be preserved (marathon-tower, lights-masts). The unit can be quickly built up out of standard light weight steel profiles. After the event the structure can be quickly taken down, transported and re-used on another site. Each unit of 2.000 seats can be re-used after the event in another place.


The second model is a continuous ring. With this ring, the stadium will be temporarily enlarged with 40.000 - 60.000 extra seats (total capacity 60.000 - 80.000 seats) for an Olympic event. The asymmetrical shape of the ring is determined by the monumental features of the stadium. The ring shrinks where it meets existing elements like the Marathon-tower and swells where there is more space. This temporary ring can be re-used after the events both as a whole and in parts.


By re-using the elements of the temporary extensions at another location after the event, the notorious "white elephant-syndrom" can be avoided. The extra investment for the stadium can come back somewhere else, supporting another big event or stimulating non-professional sports. It is thinkable that the temporary extension of the stadium starts by adding a few elements from the first model and will be developed further into the big ring. Thus, a track record of sport events can be build up easily without avoiding premature and disappointing investments. The design – a bright example of sustainability - is part of the Dutch-Belgium Bidbook for the World Championship soccer for 2018.

Project Credits
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
Archello houses of the month - January 2025
5 Feb 2025 News
Archello houses of the month - January 2025

Archello has selected its houses of the month for January 2025. This list showcases 20 of the m... More

Polish Embassy in Berlin by JEMS Architekci is a “testament to architectural diplomacy”
4 Feb 2025 News
Polish Embassy in Berlin by JEMS Architekci is a “testament to architectural diplomacy”

A project that was thirteen years in the making, the new Polish Embassy in Berlin officially opened... More

Ika.architekti builds fun and functional DIY sauna in Brno
31 Jan 2025 News
Ika.architekti builds fun and functional DIY sauna in Brno

Brno-based ika.architekti has built an upcycled sauna using an array of old materials. The project i... More

Francine Houben, Isabel Van Haute, Stephan Chevalier and DaeWha Kang named as Archello Awards 2025 jurors
27 Jan 2025 Archello Awards
Francine Houben, Isabel Van Haute, Stephan Chevalier and DaeWha Kang named as Archello Awards 2025 jurors

Archello is pleased to announce the first group of its esteemed jurors for the newly launched Archel... More

HGAA expands restaurant in Bãi Cháy with a building that embraces nature
27 Jan 2025 News
HGAA expands restaurant in Bãi Cháy with a building that embraces nature

Vietnamese architectural studio HGAA was included in Archello’s list of the 25 best architectu... More

Mole Architects elevates “mundane” 1960s English bungalow with new extension
27 Jan 2025 News
Mole Architects elevates “mundane” 1960s English bungalow with new extension

Cambridge-based architectural studio Mole Architects has completed the upgrade and extension of an e... More

New Samuel Paty School in Béziers plays with materiality
21 Jan 2025 News
New Samuel Paty School in Béziers plays with materiality

Paris-based ateliers O-S architectes (Vincent Baur, Guillaume Colboc, and Gaël Le Nouëne)... More

Domino Square in Brooklyn plays key part in redevelopment of former historic sugar refinery
20 Jan 2025 News
Domino Square in Brooklyn plays key part in redevelopment of former historic sugar refinery

Studio Cadena, a Brooklyn-based design and architecture practice, recently completed Domino Square,... More