Teobaldo Power Performing Arts Centre
@Fernando Menis

Rehabilitation of the Teobaldo Power Performing Arts Centre

Fernando Menis Arquitectos as Architects

Background

Located in the historic heart of the city of La Orotava, on Tenerife island, the Teobaldo Power Performing Arts Centre, formerly "Cine Orotava", stands on the site of the old "Casa Currás" from the 18th century. Originally intended for cinema and housing, carried out on the basis of a project signed by the architect Félix Sáenz Marrero, it was completed in 1957. The building has two well-differentiated parts with different languages: while for the housing block Félix Sáenz went to repertoires released decades before by the Provincial Housing Prosecutor's Office, the design of the movie theatre shows a building with simple and rational architecture. Subsequently, after the acquisition of the building by the La Orotava City Council in 1989, the complex undergoes various interventions to improve accessibility and adaptation to its use as an Auditorium.

Artists such as Krystian Zimerman, Alfredo Kraus, Plácido Domingo, Montserrat Caballé, Ainhoa ​​Arteta, Dulce Pontes, Michel Camilo, Luis Eduardo Aute, Luz Casal, Ana Belén, Víctor Manuel, Jorge Drexler as well as important orchestras from Europe and America have performed on its stage. Known for its excellent acoustic conditions, it has been used for the recording of countless music albums.

 

Rehabilitation

The potential capacity to accommodate users from the entire north-central half of Tenerife, together with the original good quality acoustics and the wide flexibility of uses of the building after its reform, constitute a solid base to reposition this venue in a place of reference for culture in Tenerife and the Canary Islands.

Fernando Menis's redesign and expansion project proposes solutions that guarantee the conservation of the building while adding a reversible infrastructure that is respectful of the original acoustics by enhancing the functionality of the building. Thus, in addition to basic actions (reinforcing the structure, replacing the roof, updating of stage equipment and services, adapting the building to universal accessibility requirements), it proposes several strategic actions to recover the brightness and the relevance of this cultural venue.

 

Reference building: in a symbolic gesture that reaffirms the relevance of the Teobaldo Power Auditorium, the intervention recovers the original entrance through the main façade instead of the side façade. Originally the access was made through the chamfer of the main building, where today the Municipal Tourism Office is located. The change of access took place as a result of the expansion of the stage to host symphonic concerts, condemning the old stairs, now covered with a metal substructure that supports the stage gained from the hall.

 

Greater visibility: Given the great original value, the seats are restored to comply with the regulations and to guarantee the visibility of the stage, increasing its height. For this same purpose, the stage level is reduced.

 

Multipurpose stage. The addition of a lifting platform in front of the stage allows multiple possibilities: the function of the pit, the expansion of the stage, the expansion of the seating hall (stored in a warehouse adjacent to the platform) or the scenic connection between the stage and the hall through a bleacher.

 

Respect for the original acoustics. In order to preserve the great acoustics of the hall, acoustic variations of the incorporated elements have been avoided. Thus, the seats in the hall are restored without variation in acoustics, the seats in the amphitheater have an acoustic behavior very similar to the original ones, the acoustic infrastructure is acoustically invisible and the cork in the hall is replaced by one of the same characteristics with the corresponding fire treatment.

 

Multifunctional complementary structure. The most striking, although reversible, intervention is carried out with an auxiliary infrastructure, which respects the existing configuration of the hall while providing functionality and versatility. It can be used as a support for spotlights, projectors, installations but even as a balcony for the public thus allowing performances that need to extend beyond the stage and with more complex equipment.

Read story in Español

Products Behind Projects
Product Spotlight
News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
24 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More

Barrisol Light brings the outdoors inside at Mr Green’s Office
22 Apr 2024 News
Barrisol Light brings the outdoors inside at Mr Green’s Office

French ceiling manufacturer Barrisol - Normalu SAS was included in Archello’s list of 25 best... More

Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan join Archello Awards 2024 jury
22 Apr 2024 Archello Awards
Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan join Archello Awards 2024 jury

Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan have been anno... More