The Gray Race House is located at the foot of the Orobie Alps, in the lower Valtellina valley in the Lombardy region of northern Italy. It sits at the boundary between the historic centre and newer residential development, directly beside a public fountain that once served as a shared washing place. This position gives the building a dual role: it belongs to the older urban fabric while also facing more recent expansion.
The 1970s building offers an alternative to the cycle of demolition and rebuilding. Rather than clearing the site and starting over, architect Rinaldo Del Nero focused on recovery, adaptation, and improvement. This approach preserved existing material value, reduced construction waste, and avoided the environmental impacts associated with new construction.
Transforming a fragile structure
Before intervention, the house was structurally weak and energy inefficient. Thermal losses were high, interior spaces were poorly organised, and comfort levels were limited. The renovation addressed these issues while retaining the building’s existing character.
A new upper floor was added, along with a rebuilt roof. Continuous insulation was applied internally and externally, improving thermal performance. The interior layout was redesigned to meet current living requirements, with attention to daylight, circulation, and usability. Aesthetic decisions followed the same logic as the technical interventions. The aim was not to conceal the building’s past but to adapt it for continued use.
Energy performance and certification
The results of the retrofit are measurable. The Gray Race House achieved CasaClima R certification, which is awarded to renovation projects that convert energy-intensive buildings into low-consumption homes. This certification recognizes the environmental value of upgrading existing structures rather than replacing them. In addition, the building received a CENED Energy Performance Certificate with an Energy Class A3 rating, indicating a high level of energy efficiency.
Measured outcomes
The renovation resulted in a measurable improvement in energy performance. The house now has a heating energy demand of 45 kWh/m² per year, while overall energy demand is 23 kWh/m² per year. Specific primary energy demand for heating is 5 kWh/m² per year, reflecting the performance of the upgraded envelope and insulation strategy. Operational emissions are reported at 7 kg/m² per year of CO2, showcasing the project’s successful approach to lowering energy consumption and improving environmental impact.