Archello Awards 2026 · Enter your projects before 30 September 2026
Archello Awards 2026 · Enter your projects before 30 September 2026

Volksbank Mittlerer Neckar

Volksbank Mittlerer Neckar
Muffler Architekten | Image: Brigida González

Hybrid climate concept for modern office spaces

Applied products
View all applied products

Healthy indoor conditions through modern building technology
For the new headquarters of Volksbank Mittlerer Neckar, the general contractor Ed. Züblin AG relied on modern and efficient building services. The technical design was carried out by Keppler + Kähn, who developed an integrated concept to ensure comfortable and energy-efficient indoor conditions. Our high-quality climate ceiling systems were installed, including SPECTRA M-S ceiling sails and the closed, jointless VARICOOL UNI system, both tailored to the requirements of the new building. In addition, the METAL LINE radiant baffle system was integrated. It remained inactive in this project (no heating or cooling function) but is prepared for future use or expansion.

photo_credit Muffler Architekten | Image: Brigida González
Muffler Architekten | Image: Brigida González

Focus on sustainability and comfort
Volksbank Mittlerer Neckar placed strong emphasis on sustainability, energy efficiency and acoustic comfort. The office areas require a climate concept that meets high standards for thermal comfort and sound absorption. The solution was a hybrid climate ceiling system combining concrete core activation with active heating and cooling ceilings.

On the ground floor, around 1,100 m² of perforated VARICOOL UNI gypsum radiant ceilings were installed. In the upper floors, a total of 887 activated SPECTRA M-S panels were used, including 328 units with integrated Quello PAB displacement air outlets ensuring uniform and draft-free air distribution.

photo_credit Muffler Architekten | Image: Brigida González
Muffler Architekten | Image: Brigida González

Project highlights
• Magnetic technology: SPECTRA M-S sails can be easily removed thanks to their magnetic mounting
• Hybrid system: Concrete core activation combined with active climate sails to handle peak loads
• Acoustic optimization: Perforated panels together with displacement ventilation create a quiet working environment

Successful implementation through close collaboration Coordinating additional and on-site works required close alignment between all parties. Thanks to the constructive cooperation with the subcontractor and our project team, the project was completed on schedule.

CR: Muffler Architekten | Photography Brigida González

Share or Add Volksbank Mittlerer Neckar to your Collections