Hong Kong Cricket Club Sports Annex
Kevin Mak

Hong Kong Cricket Club Sports Annex

Purcell come Architetti

The Hong Kong Cricket Club is sited in the green calm of the Wong Nai Chung Gap above the dense scrum of Hong Kong. Established in 1851, it is the oldest cricket club in Asia. The world class club, with a waitlist of around 7 years, caters to it’s 2300 members with facilties for both training and socialising. Just a few activities on offer include cricket, tennis, snooker, a gynmasium, swimming pool, and childrens play centre. You can wind down with a refreshment afterwards at one of the Club’s many food and beverage outlets.

photo_credit Kevin Mak
Kevin Mak
photo_credit Kevin Mak
Kevin Mak

Purcell first began working with the Hong Kong Cricket Club in 2013, where we drafted a masterplan for the development of the club site. As the timespan of implementation was over many years, the aim was to create a long-term view, with near-term developments made while considering the overall objectives.

With the club implementing the first phase of major reordering and structural layout changes, a series of subsequent interior enhancement projects were planned. The first of these was the sports annex building.

photo_credit Kevin Mak
Kevin Mak

Working in the hospitality sector always presents a range of challenges, notably the interface with diverse stakeholders. A successful project outcome required the team to explore, enhance and maximize the potential of the existing building and the proposed facilities by working closely with these diverse stakeholders, from the Clubs senior management, to a project steering committee, down to individual convenors of the various sporting teams that used the space(s). Working so closely with individuals that are impacted by the proposals enabled us to continue to develop a good, productive working relationship with the Club, and strengthen our in-depth understanding to inform imaginative design responses.

photo_credit Kevin Mak
Kevin Mak

The project was also interesting due to its eclectic mix of facilities and needing to seamlessly integrate them within a single area of the club. For example, a golf simulator next to a snooker room, a gym near a children’s playroom. This inclusive planning of the Clubs facilities, pairing young child, with semi-professional sports men and women, as well as social and recreational uses brought about additional challenges around safety, wayfinding and acoustics, to ensure the spaces could be equally enjoyed be all.

photo_credit Kevin Mak
Kevin Mak

Following the club’s implementation of the Masterplan Phase I, it has remained deeply committed to enhancing other facilities including those in the Sports Annex building.

The brief required exploring opportunities for space optimisation, improving the efficiency of the annex building plan, and modernising the interior materials, finishes and colour scheme. Spatially, the gym needed to be enlarged and connected to a multi-purpose space as a breakout space. Young members of the Club also needed a play area which could connect with an expanded café so that parents could relax and socialise in relative comfort whilst watching over their children in an adjacent area. Deemed surplus to requirements, the video library could be sacrificed to provide much needed space to accommodate golf simulation and snooker facilities.

photo_credit Kevin Mak
Kevin Mak

In much the same way that the masterplan resolved complex spatial relationships between the Clubs range of sporting and social spaces, the sports annex needed to unpick changes in the building plan since adding additional floor space was unfeasible.

photo_credit Kevin Mak
Kevin Mak

As the Clubs membership grew, several adhoc alterations had been completed to keep up with member demands. With the annex building being expanded in 2008, after over a decade of operation, several specific challenges had emerged, including a floor plan that was now poorly utilised, and lacked connectivity between the various uses available in the building. In addition, the building services were aging and at their end of service life and were nolonger performing to deliver the level of indoor comfort members required.

photo_credit Kevin Mak
Kevin Mak

Aside the requirements to resolve the building plan, the most significant challenge was delivering the fitout in an occupied environment while reducing impact to club operations and its revenue generating facilities.

photo_credit Kevin Mak
Kevin Mak

Space optimisation: Our design solution was to split the Sports Annex building along the main circulation route and reconfigure and liberate the plan to suit the current and future needs of the Club. On one side, the spaces prioritise the facilities for the Clubs junior members, and the other focussed on the Clubs range of indoor sporting activities, such as the gym, snooker, table tennis, and golf. At the heart of the plan is a café which encourges socialising and impromptu connections between members. As part of an inclusive design response, we considered issues that various user groups faced, in order to liberate and free up the plan. This enabled a wide range of users to equally enjoy the new spaces.

photo_credit Kevin Mak
Kevin Mak

The new finishes across the space are clean and modern with an emphasis on longevity and easy-maintenance. The prevailing use of natural materials and the colour palatte was a node to the green leafy surrounding landscape around the Club. Attention was paid to recent rennovations to the main building, so the choice of materials intentionally avoided conflict between these spaces, focussing on achieving the same standard of fit out, and continuity between the design language across distinctly different faciliites.

photo_credit Kevin Mak
Kevin Mak

Building services: were a considerable part of the project as the system within the building installed in 2008, had come to the end of its service life. Since this time, there had also been updates to Building Energy Code (BEC). With other sporting facilities on the floor above having to remain in use, coupled with the fact that the building services installation linked across these floors as well as back to the main building, a strategy to minimise service downtime had to be carefully planned, to ensure members could continue to use other facilities in the building. The result was a fitting out sequence that maintained key access routes, Club member safety, and the early release of areas of the reimagined annex to minimise the impact on facility downtime.

photo_credit Kevin Mak
Kevin Mak

Although the client did not adopt an environmental accreditation, a number of environmental proposals were incorporated into the scheme:
• Energy efficient equipment replacement
• Sensor managed lighting and solar control (blinds)
• Provision of water filtration system offering free water refills to members
• Material palette that maximised natural light and colour of light to counteract the flatness of artificial lighting. This was supported by the use of colours to add depth, refreshment and grounding.
• Use of organic and rounded forms to support psychological comfort
• Implementing a multi-sensory playspace for the members childrens

photo_credit Kevin Mak
Kevin Mak

The revised planning for the sports annex focussed on a greater level of comfort and more generous space in between the facilities. This not only provided clearer circulation routes, it enhanced the mobility for members.

To create a universal, flexible design, large format doors are provided for ease of movement between spaces.

photo_credit Kevin Mak
Kevin Mak

Inclusive design also addressed the pairing together of a diverse user group, from extremely young children, to teenagers, to semi-professional sportsmen and women, as well as social and recreational users of the club. Each of these users had their own specific requirements which needed engagement with each stakeholder.

photo_credit Kevin Mak
Kevin Mak

Team:

Purcell - Lead Consultant and Interior Designer

WSP Group - Building Services Engineer

CCI Engineers - Structural Engineer

Kevin Mak - Photographer

Caption
Caption
Products Behind Projects
Product Spotlight
News
Makoto Yamaguchi Design completes Tokyo gaming HQ with contemporary appearance of traditional Japanese pagoda
15 mag 2024 Notizie
Makoto Yamaguchi Design completa il quartier generale dei giochi di Tokyo con l'aspetto contemporaneo della tradizionale pagoda giapponese

Lo studio Makoto Yamaguchi Design di Tokyo ha completato la nuova sede di una società giappon... Altro

25 best aluminum window manufacturers
14 mag 2024 Specifiche
25 migliori produttori di finestre in alluminio

Le finestre e i sistemi di finestre in alluminio sono leggeri, resistenti alla corrosione e struttur... Altro

Snøhetta completes Norway’s first naturally climatized mixed-use building
9 mag 2024 Notizie
Snøhetta completa il primo edificio ad uso misto a climatizzazione naturale della Norvegia

Lo studio transdisciplinare di architettura e design Snøhetta ha completato il primo edificio... Altro

Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp
9 mag 2024 Notizie
Studioninedots progetta "Octavia Hill" su un sito intricato nel nuovo quartiere di Hyde Park, Hoofddorp

Lo studio di architettura e progettazione urbana di Amsterdam Studioninedots ha progettato un edific... Altro

Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space
8 mag 2024 Notizie
La Waterworks Food Hall promette a Toronto una nuova destinazione culturale di riferimento all'interno di uno splendido spazio storico

La Waterworks Food Hall, che aprirà a giugno, promette una nuova esperienza gastronomica sfac... Altro

Wood Marsh emphasizes color and form in new Melbourne rail stations
8 mag 2024 Notizie
Wood Marsh enfatizza colore e forma nelle nuove stazioni ferroviarie di Melbourne

Lo studio di architettura di Melbourne Wood Marsh ha completato lo sviluppo delle stazioni ferroviar... Altro

C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid
9 mag 2024 Notizie
C.F. Møller Architects ed EFFEKT progettano una nuova accademia marittima basata su una griglia di costruzione modulare

Gli studi di architettura danesi C.F. Møller Architects ed EFFEKT sono stati inseriti da Arch... Altro