A hat for the court

HAHA Estudio de arquitectura as Architects

Participatory budgets!!!

It all started with the school winning some participatory budgets animated by the council itself.

The objective was to get a space to play sports in the shade at the CEIP Ginés Díaz-San Cristóbal in Alhama de Murcia.

We immediately began brainstorming ideas to cover the large track on the playground. We began by proposing roofs with different inclinations to respond to the classroom building and avoid throwing a lot of shade into the classrooms so that they could continue to enjoy natural lighting and prevent the students from having the sensation that a UFO had landed on them in their beloved yard.

First, a wooden structure was thought of, taking as a reference the Pere Grau Space Cover of arqbagbut difficult to fit into the budget, in our region, a construction of this type.

The next solution that was thought of was to propose a divided roof with different earrings that would respond to the conditions of the place such as the stairs, ramps and stands of the track, but with a metal structure... The numbers did not add up until one day, our colleague Pablo Carbonell from Ecoproyecta, a studio with which we maintain a close collaboration, suggested that we think of a roof that would be self-supporting, that would not require the use of so many straps and therefore the use of so many kilos of material, which in this case would be the steel.

photo_credit Milena Villalba
Milena Villalba

This solution would be the use of curved ribbed steel sheet, that is, a self-supporting metal cover. From here, what remained to be solved was the structural system that would support the roof: metallic structure or concrete? At that time, the prices of materials began to rise uncontrollably and what would apparently be answered quickly beforehand, metal structure, in this case was not the case. Analyzing pros and cons of each system, mainly in terms of maintenance and price, we chose the precast concrete.

Therefore, we direct the project to prefabrication to try to reduce, as far as possible, the carbon footprint, the cost and the execution times of the construction.

From the moment in which the structural system was clear, we began to outline different roof solutions and construction modules responding to the previously mentioned conditions. Combinations with polycarbonate were worked to introduce overhead light to the runway in the small modules corresponding to the entrances to the runway through the ramps and in the large modules covered with metal.

This solution did not quite fit the budget, but it helped us to reach the final solution that has been carried out on the small track in the courtyard.

The next step was to study the feasibility of the small track. In this one, we had practically no determining factors, so the first discard was the polycarbonate vaults and abandoning that idea of overhead lighting and assuming that, since it is not a covered pavilion, but rather a roof for a track, the lighting was guaranteed by the 4 fronts. The next step was to think about the module that we would use and the division of the dome. The division in 3 was agreed.

photo_credit Milena Villalba
Milena Villalba

The dimensions of the track were 39.65x20 m. It was decided to cover the court with 3 light vaults of 11.24 m. This allowed us to work with some Artwing beams, which could span the 23m from pillar to pillar and also serve as a water collection system. The supporting structure of the project is made up of 8 50x50cm pillars, between 7.00-7.20 m high, with a 12.95 m center distance, and 4 beams 2.5 m wide and 1.10 m high. These precast pillars are embedded in the footings by means of a chalice, allowing us to obtain a clean meeting point between the footing and the pillar.

The roof slopes slightly towards the classroom, specifically 1% slope to facilitate the collection of rainwater at the end of the beam through a nest and a galvanized steel downspout as the final sculptural element of this roof.

The most outstanding part of the project is the roof, it is the main element, but level 0 was also worked on. The new sports court was designed taking advantage of the existing one as a firm base to reduce the generation of waste. To reduce the use of unsustainable materials, since the use of wood could not be used, we avoided the use of mesh for the track and fiberglass was used. The track, which in its current state was no longer level with the rest of the patio, but emerged as a plateau in it and around it formed slopes of earth, now increased its level with respect to level 0 of the patio, and was took the opportunity to integrate the upper faces of the footings into the track. The footings on the classroom side, where the unevenness is more pressing, 0.37 m, are resolved as benches.

Accessibility to the runway is resolved with a wide ramp that collects the 2 central footings and the connection with the large runway is improved.

Therefore, a different roofing solution is achieved, out of the standard, avoiding that figure of a gabled sheet metal roof that resembles "a farm", through 2 commonly used constructive elements such as concrete and steel, but worked differently. We believe as stated in the Architecture Quality Law "Architectural creation, the quality of constructions, their harmonious integration into the environment, respect for natural and urban landscapes, as well as collective and private heritage, are of public interest" , and so it happened because the work aroused the interest of both the older ones and, above all, the little ones at school who watched with concern and curiosity, both from class and when they were taking a break at recess, the construction of their new facility.

photo_credit Milena Villalba
Milena Villalba

Team:
Architect: HA_HA Sustainable architecture and urban planning studio (Andrés and Sergio) and collaborating architect Nuria Egea Morales
Photography: Milena Villalba
Client: Alhama de Murcia City Council
Technical architect: Jesús Miranda Requena
Builder: Pavasal Constructora S.L., Municipal technicians (José Gómez Hernández and Sonia Bedetti Serra), Municipal Brigade (Borja)

Caption

Material Used:
1. Prefabricated concrete structure: Artepref S.A.U
2. Metal vaults: MEKKIN-DG Blocotelha, self-supporting metal roofs

Caption
Caption

Read story in Español

Product Spec Sheet

ElementBrand
Prefabricated concrete structureArtepref
Product Spec Sheet
Prefabricated concrete structure
Project Spotlight
Product Spotlight
News
Makoto Yamaguchi Design completes Tokyo gaming HQ with contemporary appearance of traditional Japanese pagoda
14 May 2024 News
Makoto Yamaguchi Design completes Tokyo gaming HQ with contemporary appearance of traditional Japanese pagoda

Tokyo-based Makoto Yamaguchi Design has completed the new headquarters of a Japanese gaming company... More

25 best aluminum window manufacturers
13 May 2024 Specification
25 best aluminum window manufacturers

Aluminum windows and window systems are lightweight, corrosion-resistant, and structurally strong. S... More

Detail: Red facade and triangular plot create distinctive apartment building in Barcelona
10 May 2024 Detail
Detail: Red facade and triangular plot create distinctive apartment building in Barcelona

Barcelona-based architectural studios MIAS Architects and Coll-Leclerc have completed the developmen... More

Snøhetta completes Norway’s first naturally climatized mixed-use building
8 May 2024 News
Snøhetta completes Norway’s first naturally climatized mixed-use building

Global transdisciplinary architecture and design practice Snøhetta has completed Norway&rsquo... More

Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp
8 May 2024 News
Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp

Amsterdam-based architecture and urban design practice Studioninedots has designed a building as par... More

Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space
8 May 2024 News
Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space

Opening this June, Waterworks Food Hall promises a new multi-faceted dining experience and landmark... More

Wood Marsh emphasizes color and form in new Melbourne rail stations
7 May 2024 News
Wood Marsh emphasizes color and form in new Melbourne rail stations

Melbourne-based architectural studio Wood Marsh has completed the development of Bell and Preston ra... More

C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid
6 May 2024 News
C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid

Danish architectural firms C.F. Møller Architects and EFFEKT feature in Archello’s 25 b... More