Dear Farm

VIVA Architecture as Architects

Farmhouse using a CLT construction.

A farmhouse for a deer farm is realized in 147 days with a wood construction. The design of a no-nonsense house with lots of natural light is in stark contrast to the existing dark farmhouse.

photo_credit Koen Broos
Koen Broos

The house is built on a narrow and longitudinal footprint to get plenty of light in, and even more important, to create as many possible views to the farm yard. The timber construction material is kept visible throughout the whole interior, while applying the same wood to all the custom designed fixed furniture.

photo_credit Koen Broos
Koen Broos

Situated in a typical agricultural area, lies a large authentic ‘long-facade’ farmhouse, dating back from the late 19th century. The client wishes to convert it to their home, but given the limited budget and the expected comfort, it is decided, after an extensive study, to demolish the large existing farm and replace it with a contemporary interpretation of a typical ‘long-facade’ farmhouse, linked with the exploitation of their red deer farm.

photo_credit Yannick Milpas
Yannick Milpas

The new and smaller farmhouse is designed and constructed as a solid wood construction (CLT), taking into account permanent contact and monitoring of the deer. Transverse views are important to the client, in order to check up on the animals and intervene the moment a problem occurs.

The house is sequentially built up with spaces that are interconnected in the longitudinal direction. The resulting long axis make the house more spacious while at the same time they allow to view the deer at any time.

photo_credit Koen Broos
Koen Broos

21st century farmhouse
As with a classic farmhouse, the roof is covered with clay tiles. In this case, they continue as a facade material and are perforated by square windows in three different sizes. The short ends of the house are treated as a cutting plane and finished with glass and aluminum panels. This reinterpretation emphasizes the prototypical design of a house.

The choice for the CLT construction method has several reasons: as a reference to the traditional farmhouse with its exposed truss-construction, because of the cost saved by not finishing off the interior, and a shorter construction period in function of a business that could only tolerate work on site for up to six months due to the tranquility the deer need.

The project is particular in its intent because of a limited budget of 325.000 euro for a fully finished house of 250 square meters, kitchen, bathroom and custom made furniture included.

photo_credit Koen Broos
Koen Broos

The solid wood structure of the house was left naked on the inside, which means that the "standard" addition of a piping cavity and a finishing material is unnecessary, and the wood structure remains visible.

All custom furniture (office desk, bench, high sleepers, fire place, kitchen, ...) is made out of the same material as the wood structure, creating a full wooden interior. This was supplemented with black and white details. The rough simplicity of the interior perfectly matches the farm life.

Nevertheless, the lightness of the rooms enriches its residents and is in stark contrast with that of the old dark farmhouse.

Read story in Nederlands

Products Behind Projects
Product Spotlight
News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico
12 Dec 2024 News
Fernanda Canales designs tranquil “House for the Elderly” in Sonora, Mexico

Mexican architecture studio Fernanda Canales has designed a semi-open, circular community center for... More

Australia’s first solar-powered façade completed in Melbourne
12 Dec 2024 News
Australia’s first solar-powered façade completed in Melbourne

Located in Melbourne, 550 Spencer is the first building in Australia to generate its own electricity... More

SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse
11 Dec 2024 News
SPPARC completes restoration of former Victorian-era Army & Navy Cooperative Society warehouse

In the heart of Westminster, London, the London-based architectural studio SPPARC has restored and r... More

Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals
10 Dec 2024 News
Green patination on Kyoto coffee stand is brought about using soy sauce and chemicals

Ryohei Tanaka of Japanese architectural firm G Architects Studio designed a bijou coffee stand in Ky... More

New building in Montreal by MU Architecture tells a tale of two facades
10 Dec 2024 News
New building in Montreal by MU Architecture tells a tale of two facades

In Montreal, Quebec, Le Petit Laurent is a newly constructed residential and commercial building tha... More

RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin
10 Dec 2024 News
RAMSA completes Georgetown University's McCourt School of Policy, featuring unique installations by Maya Lin

Located on Georgetown University's downtown Capital Campus, the McCourt School of Policy by Robert A... More

MVRDV-designed clubhouse in shipping container supports refugees through the power of sport
9 Dec 2024 News
MVRDV-designed clubhouse in shipping container supports refugees through the power of sport

MVRDV has designed a modular and multi-functional sports club in a shipping container for Amsterdam-... More

Archello Awards 2025 expands with 'Unbuilt' awards categories
9 Dec 2024 Archello Awards
Archello Awards 2025 expands with 'Unbuilt' project awards categories

Archello is excited to introduce a new set of twelve 'Unbuilt' project awards for the Archello Award... More