Hafer Road

Located in the London Borough of Wandsworth close to Clapham Common and Lavender Hill, 4-8 Hafer Road. It is a cooperative housing development replacing 8 existing flats on a former bomb damaged site with 4 maisonettes and a further 12 residential units.

photo_credit Morley Von Sternberg
Morley Von Sternberg

Mark Fairhurst Architects were appointed in 2014 by Kuropatwa Ltd. the developer/ contractor for the technical design of the 16 residential apartments at Hafer Road. We were challenged to deliver what was a relatively complex concept design by Peter Barber.

photo_credit Morley Von Sternberg
Morley Von Sternberg

The key challenges of the project included
1. Delivery of a complex architectural scheme.
2. Incorporation of end user specifications.
3. Redesign of the internal courtyards and oriel windows.
4. Brick detailing.

photo_credit Morley Von Sternberg
Morley Von Sternberg

The proposed solution to the key challenges were:
1. Working closely with the developer and contractor to deliver the scheme.
2. Apartments and mainsonettes were tailored to the end user requirements including internal layouts, finishes and specifications.
3. Incorporation of structural glass bay windows and ideveloped with the glazing manufacture.
4. Integration of a varying window reveal depths, alteration of te balcony design to incorporate less intrusive steel balustrades.

photo_credit Morley Von Sternberg
Morley Von Sternberg

The building incorporates a range of sustainable features including:
1. Brown roof.
2. PV cells located on the roof to provide renewable electricity for occupants.
3. SUDS design.
4. Code for Sustainable Homes Level Level 4
5. Communal vegetable garden.
6. Cycle storage

photo_credit Morley Von Sternberg
Morley Von Sternberg

An insitu concrete frame was used this was ideal for basement construction, cantilevered balconies and stairs. A light weight pressed steel frame with masonry brick cladding was adopted allowing the integration of internal rainwater pipes. Composite windows were used with curtain walling detailing adopted for the lightwells and oriel windows.

photo_credit Morley Von Sternberg
Morley Von Sternberg

The clients were the owners of former council flats who created a housing co-operative 'On the Rise' to develop their existing building of 8 flats into 4 maisonettes and 12 flats. To facilitate the construction the group of tenants developed the site with Kuropatwa Ltd a developer/ contractor realising their vision for the site.

photo_credit Morley Von Sternberg
Morley Von Sternberg

The procurement method of a group of residents clubbing together to form a housing co-op was an innovative idea. Linking with an experienced developer enabled them to deliver the scheme.

photo_credit Morley Von Sternberg
Morley Von Sternberg

Team:

Kuropatwa Ltd - Client/Developer

Mark Fairhurst Architects - Architects (Planning & Technical Design)

Peter Barber - Architect (Concept & Planning Design)

Hall Davis Consulting Engineers - Structural Engineers

KP Acoustics - Acoustics Consultant

Buckley Design Associates - Landscape Designer

GKR Associates - Party Wall Surveyor

Mendick Waring Consulting Engineers - Mechanical, Electrical and Public Health Services

Morley Von Sternberg - Photographer

photo_credit Morley Von Sternberg
Morley Von Sternberg

Materials Used:

Windows: Aluprof
Brickwork: BEA/Wienerberger
Insitu concrete: Kuropatwa Ltd
Lightweight Steel cladding: Metsec
External paving to Courtyard: Domus, Alfresco Wheeler
Greenwall: Treebox
Brown Roof: Sedum Supply
External Doorsets: L&D Joinery
Railings: Kuropatwa Ltd Workshop
Trellis: Kuropatwa Ltd Workshop, Cedar Panels from Travis Perkins
Meter Room Metal Grating Doors: Kuropatwa Ltd Workshop
Bike Storage Canopy: Kuropatwa Ltd Workshop
Mailboxes: Safety Letterbox
Ground Waterproofing: Wykamol

Caption
Caption
Caption
Share or Add Hafer Road to your Collections