Headquarters building SADEV

The Variance P Glass Cladding System Comes to Life on Our New Headquarters

Applied products
View all applied products

This project features a fully glazed façade designed to combine architectural aestheticsinstallation precision, and technical performance. Thanks to the Variance P system, every detail was carefully engineered to ensure reliable installation and a clean visual finish.

Key Figures

  • 192 glass panels installed
  • 4 different glass dimensions
  • 2 “dead load” hooks and 2 “wind load” hooks per glass panel

Precision Installation System

Height Adjustment for Maximum Accuracy

To optimize installation precision, a height adjustment screw was integrated into one hook on each glass panel, allowing adjustments of up to 3 mm.
This solution ensured accurate alignment throughout the installation process and improved overall façade consistency.

Installation Process

Step 1: Corner Installation

The corner section was installed first to guarantee the overall alignment of the façade.

Step 2: Large Surface Installation

The main glazed surface was then installed, ensuring continuity and visual consistency across the façade.

Step 3: Smaller Surface Installation

The installation concluded with the smaller façade section.

Caption

Finishing Details

Slab edge cladding  Around the Façade Perimeter

Perimeter coping covers were installed around each façade to provide a clean and refined finish to the cladding edges.

Their main advantage is the ability to allow precise adjustments in case of misalignment, which is essential on large façade lengths.

Fast and Efficient Installation

The installation of the glass panels without coping covers was completed in only 6 to 7 days.

Caption

A Project Showcasing SADEV Expertise

This project perfectly illustrates the expertise of our teams and the architectural possibilities offered by the Variance P glass cladding system.

Products used:

  1. Variance P :
    1. 192 glass panels installed
    2. 4 different glass dimensions
    3. 2 “dead load” hooks and 2 “wind load” hooks per glass panel

Year of realisation 2026
Surface 330m²