O6A LOT Housing

sam architecture as Architects

Context
The urban regeneration zone of Clichy- Batignolles covers over 133 acres of land (54 hectares). Located in the 17th Parisian precinct, it is one of the most ambitious urban projects currently led by the city. The site bears the historical signs of transportation and logistics activities, facilitated by the train lines leading to Saintplaytime! Lazare train station and the close beltway. Therefore, the stakes of the project can be summarized by the single idea of designing a dense built environment for this neighbourhood. Hence creating the possibility to include this isolated railway site into a very much needed urban continuity.

 

The area is constructed around the Martin Luther King parc, crossing its whole length and leading to the symbolic Paris Courthouse, overlooking the northern part of the site. In this urban operation, the 6A parcel plays an essential role, located between the urbanized road Mstislav Rostropovitch to the West and the parc to the East. The question of porosities and views created between the Lazare train station and the close beltway. Therefore, the stakes of the project can be summarized by the single idea of designing a dense built environment for this neighbourhood. Hence creating the possibility to include this isolated railway site into a very much needed urban continuity.

 

The area is constructed around the Martin Luther King parc, crossing its whole length and leading to the symbolic Paris Courthouse, overlooking the northern part of the site. In this urban operation, the 6A parcel plays an essential role, located between the urbanized road Mstislav Rostropovitch to the West and the parc to the East. The question of porosities and views created between the two spaces is vital to the project definition. The final volumetric design is the direct result of the rational understanding of the programmatical and site’s constraints.

 

Volumes
The main goal for the project is to obtain as much space and sun as possible for the outdoor playgrounds of the school and daycare centre. The choice has hence been made to densify the housing areas and to exploit the legal possibilities of the site: grouping apartments into two buildings going up to 50meters high. These two towers are on the North to South diagonal of the site, allowing a maximum amount of sun for both playgrounds. At noon, the shadow from the tower will only cover the roof of the kindergarten.

 

Consequently, the second tower, hosting social housing, is comprised in a 7 floors volume. This building faces the parc and restricts the impact of the project onto parcel 06B, in terms of views and shadows. This design allows the project to create multiple views through the site. Hence participating in the alternation of 28 and 50-meter-high volumes in the neighbourhood, between parc and street.

 

Moreover, the project chooses to be as opened as possible on the parc. The space in between the towers manages to create views from the street to the parc. One can see both the parc and the foliage of the courtyard’s trees from the street, through the gap in the school building. The parc seems to be a vegetal background for this scenery created from the opening.

 

Materiality
The issue of materials is essential to architecture, but too often only applied to facades and ornaments. This project aims to put into perspective the antagonism of many buildings: it brings into conflict on one hand structural or technical materials and on the other hand the materials being used to hide them, creating an ornamenting layer. This decorative surface is often too shallow since composed with a short life span. After that, one must consider replacing them with new ones. The project tried to break free from this fashion dependable ornaments. The idea is to underline the raw quality of the material and reveal the structure of the building. The choice has been made for noble structural materials, avoiding the need for a decorative layer. From the savings obtained by removing inside decoration, the structure can appear in the most noble way as possible.

 

The beauty of materials is naturally enhanced, and their function can easily be recognized. The technical components are left visible in order to show how the building is made. For example, the choice to showcase raw concrete walls is a way to draw attention to their structural impact for the building. The main concept at work here is to aim for truth in construction. Showcasing the simplicity and transparency of the structure and technical elements of the building. The same idea is at work when it comes to the wooden structure of the kindergarten and the school. This structure can be perceived both from inside and outside the building. On the outside, the spirit of the wooden structure is translated into wooden cladding and frameworks of the same wood essence, French larch. These materials represent a structural necessity for the building as much as its initial look. The architect can regain control over the image of his production since it becomes virtually impossible to change the aspect of the construction without damaging its structural parts.

 

The process of creating a materiality that is as accurate as it is essential for the construction appears to be the first environmental approach to architecture. The design allows the building to exist through time without having to suffer from recurring aesthetical changes. It’s about creating an architecture made to have a longer life span without producing useless waste through its existence.

 

About schools
Both the school and the kindergarten were conceived with a common goal for the team: create as much use value as possible for spaces that could have been overlooked as secondary. A corridor can become an extra room, the antechamber of a classroom during small group activities for example. We aim to offer as much use as we can for one space, so that every room can enjoy multiple functions. These potentials contained in each space are supporting the idea that they can host various activities and moments. The school could also become the place for other activities once the classes are done, the space should be welcoming and opened for new ways of appropriation. The presence of a stage, framing a peculiar view on Montmartre is hereby increasing the value of its hosting room. It’s more than just a circulation hall now, it’s a useful and flexible space where one would like to stop for a while. Our architecture aims to be adaptative and flexible on the long term. The choice to showcase a structure made of columns and beams with light walls is proof of that will.

Read story in DeutschItalianoPortuguês and Français

Project Credits
Construction managing architect
Representative architect
Landscape Architects
GEC
Consulting engineers
Construction company
Product Spec Sheet

ElementBrand
ManufacturersForbo Flooring Systems
Manufacturersnora
ManufacturersJakob AG
Product Spec Sheet
Manufacturers
Manufacturers
by nora
Manufacturers
Products Behind Projects
Product Spotlight
News
Urban plan for Oostenburg in Amsterdam’s city center combines industrial heritage with urban density
31 Oct 2024 News
Urban plan for Oostenburg in Amsterdam’s city center combines industrial heritage with urban density

The artificial island of Oostenburg is the final large-scale development in Amsterdam’s city c... More

Serene home in Mexico by HW Studio is cocooned in wood and bathed with warm zenithal light
30 Oct 2024 News
Serene home in Mexico by HW Studio is cocooned in wood and bathed with warm zenithal light

Completed in July 2024, Casa Emma was designed by Mexican architectural practice HW Studio. Located... More

ITECH Research Pavilion 2024 demonstrates novel approach to bio-based hybrid architecture
30 Oct 2024 Innovations
ITECH Research Pavilion 2024 demonstrates novel approach to bio-based hybrid architecture

The latest ITECH Research Pavilion project asks the question: “How can technology drive a bala... More

Archello Awards 2024 Finalists – Projects
29 Oct 2024 Archello Awards
Archello Awards 2024 Finalists – Projects

Archello Awards 2024 has revealed the projects nominated as finalists to win each of this year&rsquo... More

Archello Awards 2024 Finalists – Products
29 Oct 2024 Archello Awards
Archello Awards 2024 Finalists – Products

Archello Awards 2024 has revealed the projects nominated as finalists to win each of this year&... More

Archello Awards 2024 Finalists – Firms
29 Oct 2024 Archello Awards
Archello Awards 2024 Finalists – Firms

Archello Awards 2024 has revealed the projects nominated as finalists to win each of this year&... More

De Zwarte Hond completes circular renovation and extension of 1970s Leiden University building
29 Oct 2024 News
De Zwarte Hond completes circular renovation and extension of 1970s Leiden University building

Architectural studio De Zwarte Hond has completed a considered circular renovation and extension of... More

Footbridge-like Villa Sidonius in Czech Republic experiments with architecture and technology
28 Oct 2024 News
Footbridge-like Villa Sidonius in Czech Republic experiments with architecture and technology

Prague-based architectural studio Stempel & Tesar architekti has completed Villa Sidonius, a ste... More