Raising of a Honegger Brothers building

Raising of a Honegger Brothers building
Federal Studio

Raising of a Honegger Brothers building

The project is in line with the policy of densification of the city center authorizing the elevation of existing buildings in Geneva. Located in the Plainpalais district, the intervention is installed on a housing building built at the end of the sixties by the Honegger brothers in a corner situation between two streets whose determining altimetries it prolongs.

photo_credit Federal Studio
Federal Studio

Without being considered as a remarkable project of these renowned architects, the pre-existing volume nevertheless presents a façade whose modenature, characteristic of the authors, highlights distinct constructive elements. The project reinterprets the original architectural language and its structural bays through a compositional diagnosis. This detailed analysis has allowed us to understand the notions of full and empty spaces, proportions, alignments or overhangs. Thus, the molded prefabricated concrete posts placed on the fourth floor balconies are in continuity with the existing facades and bring down the loads. The new windows of the elevation open onto the entire frame, offering more light to the new apartments, but are similar in their asymmetrical design to those of the existing. The sixth floor, set back, continues this intention, with a more contemporary materiality and expression.

photo_credit Federal Studio
Federal Studio

The apartments added on the fifth level are based on the existing typology, four small mono-oriented apartments and one on the corner, while on the top floor a larger apartment has a terrace with a view of the city. Finally, a "roof top" for the whole building is placed on the roof of the last level, with a 360° view on Geneva.

photo_credit Federal Studio
Federal Studio

The structure of the elevation is essentially composed of prefabricated elements made of local wood. A new floor with a technical void of about 30 cm allows the detour of ventilation ducts and rainwater pipes between the existing and new floors.

Team project : Ana-Inès Pepermans, Philippe Meier, Martin Jaques, Rafael Eloi, Lennart Steemans, Romain Lekieffre, Enzo Poncet, Alexandre Weemaels
Achievement architect: PAHK
Civil engineer: Ingeni
Heating and ventilation engineer: M+S ingénieurs conseils
Sanitary engineer: M+S ingénieurs conseils
Electrical engineer: Sedelec
Fire safety engineer: Orqual
Surveyor: HKD Geomatique

photo_credit Federal Studio
Federal Studio
photo_credit Federal Studio
Federal Studio
photo_credit Federal Studio
Federal Studio
photo_credit Federal Studio
Federal Studio
photo_credit Federal Studio
Federal Studio
Caption
Caption
Caption

Material Used:
1. Decoplus parquets – Arabica _relief 3D–Flooring
2. Wever & Ducre – Strange 1.0 Led–Lighting
3. Otis – GEN2 Comfort –Lift
4. Soprema – PIR NE-G – roof insulation
5. Nic Design – Vaso terra cool – WC sanitary appliance
6. Kaldewei – Assymetric duo–Bath sanitary appliance

Project credits

Photographers
Surveyors
Civil engineer
Heating and ventilation engineer, Sanitary engineer
Fire safety engineer

Product spec sheet

Bath sanitary appliance
Asymmetric duo by Kaldewei
Relief 3D–Flooring
Arabica by Décoplus
WC sanitary appliance
Vaso terra cool by Nic Design Srl
Lift
GEN2 Comfort by Otis
Roof insulation
PIR NE-G by Soprema
Lighting
Strange 1.0 Led by WEVER & DUCRÉ

Project data

Project Year
2022
Category
Apartments
Share or Add Raising of a Honegger Brothers building to your Collections