Colégio Agostiniano São José, Unit III
Manuel Sá
Folha de especificações do produto

ElementoMarcaNome do Produto
Vinyl floorcoveringTarkett
Ventilated facade ceramic and systemFavegrup
Furniture in generalMetadil
Acoustic wood linignOWA
Metalic brise-soleilRilfix
Lighting desing and projectUnikka iluminação

Folha de especificações do produto
Vinyl floorcovering
por Tarkett
Ventilated facade ceramic and system
por Favegrup
Furniture in general
por Metadil
Acoustic wood linign
por OWA
Metalic brise-soleil
por Rilfix
Lighting desing and project

Colégio Agostiniano São José, Unit III

Studio MV como Arquitetos

The Colégio Agostiniano São José is a catholic school located in the Tatuapé neighborhood of São Paulo and it is distributed in three major units; the project in question is exclusive for children of 2-7 years old and accommodates almost 800 students per day.

 

The school first idea was to plan a new building with 540m2 adjacent to the existing Unit III, composed of new classrooms and playgrounds, garden and administration. However, throughout the development of this expansion it became clear that a complete renovation was needed in the existing building. This new plan of refurbishments was set in place and divided in three major interventions.

 

The phase A (July-september/2017) demolished an existing wall between a small patio and the parking lot; here we managed to build a canopy with a mezzanine using a metallic structure. In the ground floor we were able to make a more spacious playground and, in the new mezzanine, a multipurpose court. In the ground level we designed some anatomic stairs that brings the children closer to an existing garden with trees; in doing so we made it more accessible to the students on a day-to-day basis while creating a multipurpose area that is used as a stage for presentations and as a playground. The acoustic wood lining and the rubber flooring were chosen to contain a little bit of the noise made in this area, for there are many classrooms open to the patios in both levels.

 

In phase B (December/2017-march/2018) we demolished the old kitchen and refectory, turning them onto new classrooms that overview the patio on the ground level (phase A). The new and improved kitchen and refectory were put in another area, much closer to where will be the connection between the existing building and the future annex. The new refectory was design with round tables that are not fixed on the floor, in order to give mere flexibility to day-to-day use and support for different activities that may occurs where.


In this period, we also designed a new patio in the last portion of the parking lot, connected by a ramp to the new classrooms mentioned above. Where we made a football court using synthetic grass suitable in size for the younger students, as well as new garden and a playground called aquaplay: made with a colorful rubber water absorbent floor and water jets coming out of the ground. Both playground and court are roofed with a permeable multicolored metalic brise-soleil. To better connect the first floor with the ground level we design a metallic stairway and its façade and roofing are also made with the same multicolored metallic brise-soleil.

 

For phase C we refurbished the remaining classrooms, administration area and all corridors in the ground level and created a small pergola for student drop off in the parking lot using the same brise-soleil solution mentioned previously. However, this phase mostly regarded the exterior walls. Up until this moment, the exterior façades were irregular and uneven due to the fact that the existing building is the sum of many smaller builing that we annexed through the years. To level the walls, we used a ventilated façade system installed with a spanish multicolored ceramic tiles facing. The result is a ludic lego inspired installation that, combined with grey metalic brise-soleils to shade and protect the windows of the classrooms, gave more proportion and unity to the composition.

Créditos do Projeto
Arquitetos
Metalic structure (construction and calculus)
Engeering and construction
Project Spotlight
Product Spotlight
Notícias
10 homes making use of straw bale construction and insulation
3 mai. 2024 Especificação
10 casas que utilizam a construção e o isolamento com fardos de palha

A palha tem uma longa história como material de construção, encontrando aplica&... Mais

ATP architects engineers completes office building in line with “New Work” principles and sustainability goals
3 mai. 2024 Notícia
ATP architects engineers conclui edifício de escritórios em conformidade com os princípios da "Obra Nova" e os objectivos de sustentabilidade

ATP architects engineers concluiu um edifício operacional e de escritórios sustent&aac... Mais

SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport
2 mai. 2024 Notícia
SOM conclui “terminal num jardim” no Aeroporto Internacional Kempegowda de Bengaluru

A empresa internacional e interdisciplinar de arquitetura, design e engenharia Skidmore, Owings &... Mais

Archello houses of the month - April 2024
1 mai. 2024 Notícia
Casas Archello do mês - abril de 2024

A Archello seleccionou as suas casas do mês para abril de 2024. Esta lista apresenta 20 das ca... Mais

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
30 abr. 2024 Notícia
O Centro de Arte Cívica de Zhuhai Jinwan, dos arquitectos Zaha Hadid, faz eco dos padrões chevron das aves migratórias

Desenhado por Zaha Hadid Architects, o Zhuhai Jinwan Civic Art Centre é definido pelas linhas... Mais

25 best metal cladding manufacturers
2 mai. 2024 Especificação
25 melhores fabricantes de revestimentos metálicos

O revestimento metálico pode combinar a funcionalidade com a estética, ao mesmo tempo... Mais