Emerson-Verdant offices
Maxime Brouillet

Emerson-Verdant offices

YH2_Yiacouvakis Hamelin architectes als Architekten

Housed in an industrial building built by the aircraft manufacturer Bombardier in the 1980s, Emerson-Verdant's new premises take advantage of this atypical space to create a unique workplace.

For environmental and budgetary reasons, we wanted to make the most of the existing elements. To keep the industrial identity of the place, apparent mechanics, underlined structure, stripping and repolishing of the existing concrete slab and to intervene in a measured way by using natural materials like wood and felt. With a final budget, including furniture, of $50/sq.ft., this project illustrates the possibilities of a conscientious and careful architecture.

photo_credit Maxime Brouillet
Maxime Brouillet
photo_credit Maxime Brouillet
Maxime Brouillet

The removal of the existing suspended ceilings and the updating of the double-height space directed the project towards a work of spatial composition within this vast volume now revealed. A dynamic path is created through spaces of changing proportions.

The entrance is made in the low ceiling space, where the reception, the administration and the research and development department are gathered, uses with limited access and requiring calm and concentration, set back from the main volume. The clean composition and use of dark colors distinguish these areas from the rest of the premises and give them their own atmosphere.

photo_credit Maxime Brouillet
Maxime Brouillet
photo_credit Maxime Brouillet
Maxime Brouillet

From the entrance, a visual axis creates a call towards the main space entirely painted white which expands in double height, bright, light and airy. This contrast between the two zones allows for a clear distinction in the uses, atmospheres and rhythm of the space.

In order to reinforce this perspective, a large glass panel is installed at the end of the axis replacing a loading dock door, a luminous call punctuating the route.

photo_credit Maxime Brouillet
Maxime Brouillet
photo_credit Maxime Brouillet
Maxime Brouillet

Buildings within buildings, several places are defined in the double height space. Like nesting dolls, they take place in this vast volume, each housing a function. Offices for individual work, meeting rooms, call zones, cafeterias, formal or informal meeting spaces. The challenge here is to conceive multiple workplaces within a large open space where sound travels and the eye travels.

In such a vast space, each architectural intervention must serve the acoustics of the place. Several gestures are implemented: installation of compressed wood fiber panels (Tectum) on the walls and ceiling, use of felt in different forms or textured wood screens.

photo_credit Maxime Brouillet
Maxime Brouillet
photo_credit Maxime Brouillet
Maxime Brouillet

These acoustic elements cohabit with luminous globes. The latter are present throughout the double-height space and act as a guiding thread throughout the stroll. Together, they inhabit the volume and give it an aesthetic of its own.

As if scattered in the middle of the stroll, mobile and light furniture can be placed and moved easily. These elements contribute to the modularity of the place and allow users to appropriate the spaces.

A measured intervention that respects and enhances its existing environment, this project manipulates contrasts; compression/dilation, dark/light tones, mass/lightness, and materials to generate a dynamic workplace where functionality and uniqueness resonate.

photo_credit Maxime Brouillet
Maxime Brouillet
photo_credit Maxime Brouillet
Maxime Brouillet

Team:
Architects: yh2
Contractor: Entrepreneur général Bazuk Inc.
Engineer: Ingénieurs Génie X
Photography: Maxime Brouillet

Caption
Caption
Caption
Products Behind Projects
Product Spotlight
Nachrichten
SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport
2 Mai 2024 Nachrichten
SOM stellt das „Terminal im Garten“ am internationalen Flughafen Kempegowda in Bengaluru fertig

Das internationale und interdisziplinäre Architektur-, Design- und Ingenieurbüro Skidmore,... Mehr

Archello houses of the month - April 2024
1 Mai 2024 Nachrichten
Archello Häuser des Monats - April 2024

Archello hat seine Häuser des Monats für April 2024 ausgewählt. In dieser Liste werde... Mehr

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
30 Apr. 2024 Nachrichten
Das Zhuhai Jinwan Civic Art Centre von Zaha Hadid Architects erinnert an die Chevron-Muster von Zugvögeln

Das von Zaha Hadid Architects entworfene Zhuhai Jinwan Civic Art Centre zeichnet sich durch die futu... Mehr

25 best metal cladding manufacturers
2 Mai 2024 Spezifikation
25 beste Hersteller von Metallverkleidungen

Metallverkleidungen können Funktionalität und Ästhetik miteinander verbinden und glei... Mehr

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
30 Apr. 2024 Nachrichten
Nieto Sobejano Arquitectos' Restaurierung des Münchner Museums findet Freiheit innerhalb der Grenzen

Nieto Sobejano Arquitectos hat die Sanierung und Erweiterung der Archäologischen Staatssammlung... Mehr

Introducing Partner Lemi Group
30 Apr. 2024 Partnernachrichten
Partner Lemi Group stellt sich vor

Lemi Group ist ein international führendes Unternehmen in der Entwicklung und Herstellung von B... Mehr

Archello Awards 2024 – Early Bird submissions ending April 30th
19 Apr. 2024 Nachrichten
Archello Awards 2024 - Early Bird Einreichungen bis 30. April

Die Archello Awards sind ein aufregendes und erschwingliches globales Preisverleihungsprogramm, das... Mehr