Housing And Urban Development Project In Manresa

Housing And Urban Development Project In Manresa

Architect
PichArchitects
Location
Catalonia, Spain
Project Year
2008
Category
Housing
Adrià Goula

Housing And Urban Development Project In Manresa

PichArchitects as Architects

The proposal of the buildings and the open spaces has been structure from the consideration that the environment where the project is developed has got several point of view and confrontation with the existing city.


We can resume in three points this complexity: • The relation with the “high” city which gives a leadership to the roofs and the different treatment of the pavements and the levels of the open spaces make up a “horizontal facade” which maintains the same strength and urban intention as the real facades. Green water-tank roofs are proposed with this objective. • The relation with the St. Ignasi street as a principal access in the future city; the projects sets an typological organization and a rhythm in the façade with a constant alignment for generating a set that marks a clear urban boundary. • The relationship with Montserrat street, where the buildings are planned to interpret the existing city with its irregularities and minimum parcel.


The proposed arrangement tries to generate open spaces for pedestrians but at the same time it looks for spaces of relation between the different buildings. All the halls to the apartments are facing the Montserrat street becoming a public space of connection between the houses. ENVIRONMENTAL SUSTAINABILITY AND TECHNOLOGICAL INNOVATION PARAMETERS WATER In the matter of water saving we propose constructive systems and facilities that make an efficient use of the consumption and use of water, as well as the use of savings mechanisms proposed:


- Ecological green water tank roof: allows the provision of a green roof without irrigation and minimal maintenance. The landscaped area in an urban context , plus a visual and playful effect , is mainly a source of air purification ( transforming CO2 pollution in O2). The study of the rainfall of the place makes us to dispense of other uses of water stored in no more than water-tank roof garden . In the case of very heavy rainfall a reservoir stores the water drained, which is afterwards pumped to the roof when needed. - Reuse of gray water. Studio water flows and storage tanks and maintenance needs. - Device regulator water pressure at the entrance of the building. - Saving systems for toilets. - Systems saving faucets and appliances, opening a rebound , aerators and flow restrictors ( maximum flow of 12 liters per minute)


ENERGY Mainly focused on building systems project in the bioclimatic building performance as well as the detailed study of the isolates, avoiding thermal bridges.


- Thermal insulation is increased in all them stay by 20 % compared to that required by regulation 87 NRE -AT. Insulation thickness is increased from 5 to 8cm (can exceed 6% of global demand of a standard building). Insulation is available in slabs located on unheated places (can exceed an additional 20 % of global demand). Improvement in quality of carpentry, avoiding thermal bridge with an estimated 4% savings. All are double glazed joinery. - A coefficient minor or equal to 3.30 W/m2 thermal transmittance K is studied for at all openings - The roof improves the thermal insulation with respect to a traditional inverted cover. With the added advantage of the thermal inertia of the water surface. Alternatives that incorporate elements of thermal inertia mean an additional saving of 2% and improve the cooling demand which can be reduced by 50 %. - The facades of the project contemplated a cluster of holes and an array of blades, which generate a flow mattress or climate provide perfect cross ventilation of all types and control them from radiation. - The project, the orientations and patios are studied to ensure that all typologies have cross ventilation, solar chimneys are integrated in places were the demanded density does not allow it. - Industrialized concrete panels allow: Higher quality facades and tightness. A great opportunity to colors and textures. Continuous insulation across the front. A high speed assembly and manufacturing, thereby saving resources and energy. Qualitatively improve safety in work. - Active solar systems are placed. Solar collectors on deck for both domestic hot water and to support some indoor heating.


- The set of proposed solutions allow them; • Being able to guarantee summer temperatures and moisture sensitive inside terms of comfort without any need for artificial installation of air conditioning equipment. • In winter you can achieve standards of comfort and performance at an estimated savings of 40% in respect to a conventional building (considering all the passive and active installations proposals).


Featured Projects
Latest Products
News
Merk X revitalizes Amsterdam Zoo natural history building that was closed for 75 years
20 May 2022 News
Merk X revitalizes Amsterdam Zoo natural history building that was closed for 75 years

The neoclassical building was built between 1850 and 1855 to a design by Johannes van Maurik as a na... More

82,000 unique, hand-crafted tiles clad the new extension to Museum Arnhem by Benthem Crouwel Architects
20 May 2022 News
82,000 unique, hand-crafted tiles clad the new extension to Museum Arnhem by Benthem Crouwel Architects

In addition to restoring the original Museum Arnhem building, complete with characteristic historic... More

Estudio MMX interweaves open spaces throughout porous pigmented concrete villa
19 May 2022 News
Estudio MMX interweaves open spaces throughout porous pigmented concrete villa

A sequence of open spaces with a gradual degree of intimacy allow residents to move gently from the... More

Baumschlager Eberle Architekten’s Montagne du Parc demonstrates how concepts of sustainability can be implemented at an early stage of architectural completion
19 May 2022 News
Baumschlager Eberle Architekten’s Montagne du Parc demonstrates how concepts of sustainability can be implemented at an early stage of architectural completion

The largest project completed by Baumschlager Eberle Architekten in Europe to date, the new Montagne... More

Find products by looking at inspirational projects
18 May 2022 Inside Archello
Find products by looking at inspirational projects

Archello’s new Inspiration guide is the world’s first and largest reference guide with a... More

Artlist office design celebrates creativity while emphasizing work, efficiency, and collaboration
18 May 2022 News
Artlist office design celebrates creativity while emphasizing work, efficiency, and collaboration

For busy Israel-based technology company Artlist, designers Switchup created an office concept that... More

Experimental Co-Housing Denver project by Productora provides a compelling model for centrally located, low-cost housing
17 May 2022 News
Experimental Co-Housing Denver project by Productora provides a compelling model for centrally located, low-cost housing

Only a few miles from the downtown area of Denver, this experimental co-housing project by Productor... More

Baumschlager Eberle Architecten create an architectural statement for a natural setting in Alpe Furx
17 May 2022 News
Baumschlager Eberle Architecten create an architectural statement for a natural setting in Alpe Furx

On a sloping site in the Austrian ski resort of Alpe Furx, this holiday and leisure development by B... More