ICS Integrated Comprehensive School
Marcus Ebener
Product Spec Sheet

ElementBrandProduct Name
Fire protection doors in the interior corridorsJansen
Roof waterproofingSika
Aluminum facade and windowsSCHÜCO
Rubber floornora
Woodwool lightweight ceilingsTroldtekt A/S
Cross laminated timber wallsBinderholz GmbH

Product Spec Sheet
Fire protection doors in the interior corridors
by Jansen
Roof waterproofing
by Sika
Aluminum facade and windows
by SCHÜCO
Rubber floor
by nora
Woodwool lightweight ceilings
Cross laminated timber walls

ICS Integrated Comprehensive School

Bez + Kock Architekten as Architects

The site of the Integrated Comprehensive School is located at Burgfeldsweide, south of the city center of Rinteln (Lower Saxony). A simple and geometrically clear structure, designed for a maximum of 900 pupils, complements the ensemble on the school site opposite the existing high school. With its calm, rectangular geometry, the two-story new building formulates an urban counterpoint to the evolved structure of the existing building. Its façade is made of larch wood, which was cut in the client's own forestry operation. Facing the schoolyard, the 112 m long school building has an open entrance zone along its entire long side, which serves as a welcome gesture, a covered break area, a communication space and access to the individual learning clusters. This mediating entrance creates a low-threshold access into a bright and friendly school building.

photo_credit Marcus Ebener
Marcus Ebener

The internal layout of the new building is also clear and simple: three rectangular double clusters sit on a base occupied by subject rooms and administration, which are subdivided and lit via four inner courtyards. Designed as play yards or interior reed gardens, the inner courtyards allow for easy orientation within the building and clear address formation of the individual clusters.

photo_credit Marcus Ebener
Marcus Ebener

Music and art rooms form the central block of specialized classes on the ground floor, the rather more robust area of workshops is oriented to the west, and the specialized science classes define the back of the building to the north. The administrative area is located close to the bus stops and parking lots, and is thus accessible to parents and teachers by a short route - and yet arranged rather discreetly with respect to school operations.

photo_credit Marcus Ebener
Marcus Ebener

The ICS was designed to be barrier-free, integrative and sustainable. It is designed as a demountable solid wood building with a timber frame façade, almost all essential structural and building components remain visible in the interior. This makes the timber construction an initial component of the design concept. Pleasant room atmosphere and material haptics are combined with rational production, short construction time and a future-oriented energy concept.

photo_credit Marcus Ebener
Marcus Ebener

The new building has KfW 55 standard and is supplied with biogas from a nearby plant. The primary energy factor is fp=0.00. With a yield of 176,000 kWh, the photovoltaic system almost completely covers the projected annual electricity consumption of approx. 200,000 kWh. A total of approx. 2,815 m3 of wood and only approx. 2,650 m3 of concrete were used.

Team:
Local construction management: Ernst2 Architekten AG, Hannover
Project management: pmd Gesellschaft für Projektmanagement, Düsseldorf
Structural engineering: Wetzel und von SehtGbR, Hamburg
HVAC planning: Reich und Hölscher Ingenieur büro, Bielefeld
Electrical planning: Ingenieurbüro Schröder und Partner, Bielefeld
Building physics: ISRW Dr-Ing. Klapdor GmbH, Bielefeld
Landscape design: Büro für Freiraumplanung Christine Früh, Hannover

photo_credit Marcus Ebener
Marcus Ebener
photo_credit Marcus Ebener
Marcus Ebener
photo_credit Marcus Ebener
Marcus Ebener
photo_credit Marcus Ebener
Marcus Ebener
Caption
Caption
Caption

Material Used:
1. Cross laminated timber walls: Binderholz construction systems / executed by Grossmann Bau GmbH Rosenheim 
2. Precast concrete base: Betont GmbH / executed by Grossmann Bau GmbH Rosenheim
3. Wooden formwork-facade: Wood from the Spießingshol district forestry office (Schaumburg district) / sawn by the Scharnhorst sawmill (Neustadt am Rübenberge) / installed by Grossmann Bau GmbH Rosenheim
4. Aluminum facade and windows: Schüco / executed by Fricke Metallbau Nienstädt
5. Sun protection: Warema, executed by Fricke Metallbau Nienstädt
6. Roof waterproofing: Sika / executed by Pieper Bedachungen GmbH Nienburg
7. Cast stone: Marmi Scala / executed by Stone West GmbH Barsinghausen
8. Rubber floor: nora norament / executed by Holschbach GmbH Morsbach
9. Woodwool lightweight ceilings: Troldtekt Ultrafein / executed by Käfer Construction GmbH Hannover
10. Fire protection doors: on the so-called ‚Schulstrasse‘ Hoba / executed by Käfer Construction GmbH Hannover
11. Fire protection doors in the interior corridors: Jansen / executed by Fricke Metallbau Nienstädt
12. Interior doors: Neuform / executed by Hüther GmbH Hedemünden

Read story in DeutschFrançaisItalianoEspañol and Português

Products Behind Projects
Product Spotlight
News
Emixi Architectes designs a temporary classroom pavilion in a park
1 Mar 2024 News
Emixi Architectes designs a temporary classroom pavilion in a park

Lausanne-based Emixi Architectes has completed the design and build of a temporary classroom pavilio... More

RAUM completes the meticulous rehabilitation and extension of a community swimming pool
29 Feb 2024 News
RAUM completes the meticulous rehabilitation and extension of a community swimming pool

French architectural studio RAUM architectes has completed the meticulous rehabilitation and extensi... More

Archello Houses of the Month - February 2024
29 Feb 2024 News
Archello Houses of the Month - February 2024

Archello has selected its Houses of the Month for February 2024. This list showcases the 20 most out... More

Appareil Architecture’s prefabricated modular cabin prioritizes eco-responsibility
29 Feb 2024 News
Appareil Architecture’s prefabricated modular cabin prioritizes eco-responsibility

Montreal-based Appareil Architecture has completed the Micro-Cabine, a small-scale cabin that was de... More

Lori Zillante, Ermis Adamantidis, Grace Coulter Sherlock and Oliver Braun join Archello Awards 2024 jury
29 Feb 2024 Archello Awards
Lori Zillante, Ermis Adamantidis, Grace Coulter Sherlock and Oliver Braun join Archello Awards 2024 jury

Archello is excited to introduce four new jurors joining the panel for the Archello Awards 2024 prog... More

10 residential buildings that make a feature of exterior stairs
28 Feb 2024 Specification
10 residential buildings that make a feature of exterior stairs

A staircase or stairway is one of those architectural elements that we take for granted on a daily b... More

Bernardo Bader Architekten designs a contemporary take on a traditional hut
26 Feb 2024 News
Bernardo Bader Architekten designs a contemporary take on a traditional hut

Bregenz-based Bernardo Bader Architekten designed Haus Gapfohl as a solitary wood dwelling — a... More

Stacked boxes create a zigzagging indoor-outdoor plaza in Nanhu District, Jiaxing
26 Feb 2024 News
Stacked boxes create a zigzagging indoor-outdoor plaza in Nanhu District, Jiaxing

B.L.U.E. Architecture Studio (Beijing Laboratory for Urban Environment) has completed Seed Plaza in... More