Velzeke Sport Centre was built using C-GRID carbon connection in the precast wall panels (3x8m) As the walls are fully load bearing there is no need to use columns anymore. The precast part was fully erected in 2 days!
Sport Centre Velzeke
Applied Products
Share or Add Sport Centre Velzeke to your Collections