Headquarters for a Block Factory
Rafaela Netto

Headquarters for a Block Factory

vão as Architects

In the middle of 2015 the partners of the newly inaugurated concrete block factory in Avaré, São Paulo countryside, sought us to design their headquarters on a commercial avenue parallel to the highway. However, some issues such as the urgency of opening up the space, the low budget available and the fact that the plot was rented, prevented a conventional block construction. Initially  the customers suggested buying a container in order to minimize the time and cost of the work, however, it didn't seem coherent to us that the construction of the future block factory office and showroom didn't employ their own produced material.

photo_credit Rafaela Netto
Rafaela Netto
photo_credit Rafaela Netto
Rafaela Netto
photo_credit vão
vão

During one of the visits to the factory, we observed the material storage and transport system in piles that, supported on pallets, reached up to 3,60m high. Empirically, the system seemed to refer to the ancient megalithic constructions, predecessors to the invention of binding substances, which had the force of gravity as the main stabilizing element.

photo_credit vão
vão
photo_credit vão
vão
photo_credit vão
vão

Thus it occurred to us that with the absence of mortar between the blocks the work would be transformed into a quick assembly. In addition, the possibility of reuse the material in the event of an address change, advantage in the container case, was reopened. Since the number of blocks wasn't a problem, stability would be guaranteed by significantly increasing the wall thickness of blocks, turning them into true ramparts of bonded blocks.

photo_credit Rafaela Netto
Rafaela Netto
photo_credit Rafaela Netto
Rafaela Netto
photo_credit Rafaela Netto
Rafaela Netto

From then on the relationships between height, weight and contact surface of the bonds began to be explored both in the design and in prototypes at the construction site. The research resulted in two bonding configurations: the system for longitudinal walls of 0.6m wide and the system for transversal walls of 1.20m wide. To level and lock these walls vertically, the logic of the observed system during the visit was reproduced in the work, replacing the pallets for slabs each six rows.

photo_credit Rafaela Netto
Rafaela Netto
photo_credit vão
vão

In both the intermediate and roofing slabs, the precast concrete slabs were juxtaposed without the ceramic tiles as usual in brazilian constructions, in other words, the air space that would be generated by them was filled by the concrete, significantly increasing the weight of the slabs in order to assist in the larges ramparts locking. The modulation also conditioned the solution for ventilation openings (pivoting metal plates) and lighting (fixed glass panes between the floor ceiling heights) that overcome the gap between two locking slabs.

Caption
Caption
Project Spotlight
Product Spotlight
News
Wangen Tower is first multi-level and climbable structure to use self-shaped timber components
15 May 2024 Innovations
Wangen Tower is first multi-level and climbable structure to use self-shaped timber components

Wangen Tower is the first multi-level and climbable structure to use self-shaped, structural timber... More

Lumi Shala by IBUKU is a sculptural bamboo-grid-shell yoga center in Bali
15 May 2024 News
Lumi Shala by Ibuku is a sculptural bamboo-grid-shell yoga center in Bali

Lumi Shala is an artisanal wellness space at the Alchemy Yoga Centre in Bali designed by local archi... More

Makoto Yamaguchi Design completes Tokyo gaming HQ with contemporary appearance of traditional Japanese pagoda
14 May 2024 News
Makoto Yamaguchi Design completes Tokyo gaming HQ with contemporary appearance of traditional Japanese pagoda

Tokyo-based Makoto Yamaguchi Design has completed the new headquarters of a Japanese gaming company... More

25 best aluminum window manufacturers
13 May 2024 Specification
25 best aluminum window manufacturers

Aluminum windows and window systems are lightweight, corrosion-resistant, and structurally strong. S... More

Detail: Red facade and triangular plot create distinctive apartment building in Barcelona
10 May 2024 Detail
Detail: Red facade and triangular plot create distinctive apartment building in Barcelona

Barcelona-based architectural studios MIAS Architects and Coll-Leclerc have completed the developmen... More

Snøhetta completes Norway’s first naturally climatized mixed-use building
8 May 2024 News
Snøhetta completes Norway’s first naturally climatized mixed-use building

Global transdisciplinary architecture and design practice Snøhetta has completed Norway&rsquo... More

Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp
8 May 2024 News
Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp

Amsterdam-based architecture and urban design practice Studioninedots has designed a building as par... More

Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space
8 May 2024 News
Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space

Opening this June, Waterworks Food Hall promises a new multi-faceted dining experience and landmark... More