Visitor traffic flows and internal circulation were reorganized. All processes were also optimized. The forest and alpine operations have been clearly separated from the multi-collection point. Assuming a maximum service life of 20 years, the new building for the multi-collection point will be constructed as a mixed steel/wood structure. This construction would be demountable and could possibly be reused at another location.