New York City Center

New York City Center

Architect
RKTB Architects, P.C.
Location
131 W 55th St, New York, NY 10019, USA | View Map
Project Year
1998
Category
Theaters
Richard Rodamar

New York City Center

RKTB Architects, P.C. as Architects

City Center Theater was built in 1924 as City Center/Mecca Temple for the Ancient Order of Nobles of the Mystic Shrine (the Shriners). In 1943 the Moorish-style building became the City Center of Music and Drama, home of the New York City Ballet and the New York City Opera.

RKTB began its relationship with the landmark building in 1982 with a phased renovation and adap­tation of the Shriners auditorium into a 2,750-seat theater specifically for the performance of dance. By the time the firm was called in parts of the ceiling had begun falling, the entire “Moorish” design had been painted over, and restrooms were inadequate. In addition, site lines were poor: audience members could not see the dancers’ feet.

During Phase I the entire ceiling was “sounded” and both ornamen­tal and flatwork plaster was repaired. Due to limited funds only a four-color paint scheme was permitted but the entire auditorium was painted to bring back the Moorish flavor. New seats and carpets were installed, and the space was made ADA accessible. The en­tire sloped floor was removed and re-raked, resulting in the loss of three rear rows of seats. That space was used to enlarge the inner lobby to improve milling space and vending areas. The fast-track phase was completed during a twelve-week blackout between shows.

A second phase included carving out a stage right from an ad­jacent space; moving the rigging from stage right to stage left; modernizing dressing rooms; creating a Green Room; and re-building/enlarging toilets at the first balcony. An additional, 299-seat theater was built in the basement with dress­ing rooms, a prop room, scene shop, lobby with vending, and offices. A third, 99-seat, “black box” theater was added to the basement level with dressing rooms, a cos­tume shop, and laundry. With two lower-level theaters and a main stage with two balconies, accessibility upgrades were also necessary and RKTB replaced an existing oversized stair with a smaller one and installed a new, large el­evator.

The original orchestra pit was level with the house, its space filled with three rows of temporary seats when the orchestra was moved onstage for certain productions. A new, unique Gala lift was installed, cutting the changeover to two days. For the balconies (and eventually the entire theater), RKTB designed and had specially woven a Moorish-themed carpet. In addition, seat stanchions were specially cast with the City Center logo.

On the Promenade Level the white paint was removed from the ceiling and lunettes, and the damaged original was repaired. Existing lighting was re-worked to provide a modern level of illumination, and the marble stairs and terrazzo floors were restored. Three large rooms originally used for the Shriners' cere­monial meetings were over­hauled with air conditioning, new light­ing, and sprung floors to be used as rehearsal rooms with dressing rooms.

In the final phase, RKTB trans­formed a former emergency egress corridor into a reception lounge containing a bar, permanent seating, and service area for food preparation, coatroom, and storage.

Featured Projects
Latest Products
News
Phoebe Says Wow Architects take a novel approach to coffee in the city with their renovation of Fifteen Steps Workshop Coffee
25 Jan 2022 News
Phoebe Says Wow Architects take a novel approach to coffee in the city with their renovation of Fifteen Steps Workshop Coffee

In a bustling commercial district of Taipei, Phoebe Says Wow Architects undertook this renovation of... More

Simple and robust Paris Metro Line reaches great depths with an impressive structural concept
25 Jan 2022 News
Simple and robust Paris Metro Line reaches great depths with an impressive structural concept

Located at the base of the Paris judicial tribunals, the new Porte de Clichy station by AZC Atelier... More

Holiday Home Hagen features an abstract façade made of ‘knitted’ logs
24 Jan 2022 News
Holiday Home Hagen features an abstract façade made of ‘knitted’ logs

On the outer skirts of Laterns Bonacker, Holiday Home Hagen by Marte.Marte Architects is part of a s... More

Lafine de Paris Wedding Showroom provides a unique platform for works of art
21 Jan 2022 News
Lafine de Paris Wedding Showroom provides a unique platform for works of art

In China, Huqiu Wedding City is an important wholesale and retail base for the wedding industry that... More

Peloponnese Rural House by Architectural Studio Ivana Lukovic provides needed respite for a nature-loving family
21 Jan 2022 News
Peloponnese Rural House by Architectural Studio Ivana Lukovic provides needed respite for a nature-loving family

Surrounded by picturesque olive groves in the Greek village of Kalamia, Peloponnese Rural House by A... More

New Alcalá church by Beautell Arquitectos takes a new approach to the traditional architecture of the Canary Islands
21 Jan 2022 News
New Alcalá church by Beautell Arquitectos takes a new approach to the traditional architecture of the Canary Islands

Since the 2011 demolition of the old Alcalá Church for security reasons, locals of the Canary... More

Casa en la Piedad by Cotaparedes Arquitectos offers an exploration of introspective architecture
21 Jan 2022 News
Casa en la Piedad by Cotaparedes Arquitectos offers an exploration of introspective architecture

An exploration of introspective architecture, Casa en la Piedad by Cotaparedes Arquitectos is locate... More

Austria, France, and Spain lead Mies van der Rohe Award shortlist with five nominations each
20 Jan 2022 News
Austria, France, and Spain lead Mies van der Rohe Award shortlist with five nominations each

A seven member jury, consisting of Tatiana Bilbao, chairwoman, Francesca Ferguson, Mia Hägg, Tr... More