Lee High School

Lee High School, The Historic Retrofit

YKK AP America Inc. as Manufacturers

The impetus for the remodel of Lee High School

A needed campus expansion and building upgrade served as the impetus.  Lee High School added a new classroom building, a new cafeteria and front entrance to the existing building.  In addition, fire upgrades and modernization for computers and lighting were also needed.

Why the windows were chosen

YKK AP was able to replicate the historic look of the original windows and keep in theme with the building while also providing performance and sustainability.  There was a significant thermal performance and improved u-factor with the new YKK AP windows.  Basically the architect hand sketched what he wanted, and we replicated it.

The original windows were wood, with divided lites and contoured brick and mullion molding.  The new specification was for a hung window, putty bead glazing perimeter, and applied exterior grids with a muntin in the glass.  Water infiltration caused much of the original wood perimeter and mullions to deteriorate, and they would not support current window loads.  The original wood was demoed and concrete opening surrounds were installed.  Double wood bucks were installed at the perimeter.  YKK AP installed a full-length sill starter with end dams without any anchor penetrations in the water tank.  The primary water seal of the new system was at the waterproofing that was installed on the wood bucks and the primary window frames and sill starter.

Caption

YKK AP provided 5 inch wide aluminum mullions that simulated the depth of the original wood mullions, wide interior mullion covers and extended interior trim blended in with new interior finishes.  The perimeter brick moldings were replicated with a post set panning around the perimeter of each single hung window and were fabricated in Mac's Glass Shop and installed as one piece in the opening.  The post set panning was then sealed to provide a secondary water barrier.

The primary window was YKK AP single hung, YVS 410 TU, H-AW 65, with applied grid and muntins in the glass.  Laminated glass was used on the first floor windows for security, which does not allow smash and grab or vandalism if the glass on the first floor is broken.

Design & construction challenges

The design concept was refined during the construction process.  Historic review was critical to simulate the original school design.  There was a second system that consisted of fixed and projected windows in the courtyard of the school.  Water filtration was an issue too, as mentioned above.

Differences between old and new windows: keeping the historic nature

The new windows resemble the original windows, but meet modern codes.  The windows that were replaced were not historical and the original historic brick and mullion moldings were all covered by a square metal panning which reduced the day light openings.  The replacement windows were clear anodized, and the new windows were painted.  The original windows had horizontal mullions but no historic wood replication.  The replacement windows were not thermally broken and appeared as tough as they were in the 1970s.

Products Behind Projects
Product Spotlight
News
Design of new CIA Conad HQ by tissellistudioarchitetti resists orthogonality and symmetry
21 Jun 2024 News
Design of new CIA Conad HQ by tissellistudioarchitetti resists orthogonality and symmetry

Italian architectural studio tissellistudioarchitetti has designed the Sidera building as a new head... More

Compelling design for Jadgal School by Daaz engages a rural Iranian village
21 Jun 2024 News
Compelling design for Jadgal School by Daaz engages a rural Iranian village

Located in Seyedbar-Jadgal village in Southern Iran, the Jadgal School by Daaz was commissioned afte... More

Dirk Peters, Cristiana Catino, Javier López and Monica Arango join Archello Awards 2024 jury
21 Jun 2024 Archello Awards
Dirk Peters, Cristiana Catino, Javier López and Monica Arango join Archello Awards 2024 jury

Dirk Peters, Cristiana Catino, Javier López and Monica Arango have been announced as Archello... More

UNStudio completes Munich residential building with versatile plug-in partition and furniture system
20 Jun 2024 News
UNStudio completes Munich residential building with versatile plug-in partition and furniture system

International architecture and design practice UNStudio has recently completed the “Van B&rdqu... More

ZAV Architects leverages the “grandmother’s” circular economy approach in design of Dr. Beski Science Foundation
19 Jun 2024 News
ZAV Architects leverages the “grandmother’s” circular economy approach in design of Dr. Beski Science Foundation

Iranian architectural office ZAV Architects features in Archello’s 25 best architecture firms... More

Hyperboloid Green Ark pavilion forms heart of Meise Botanic Garden greenhouse complex
19 Jun 2024 News
Hyperboloid Green Ark pavilion forms heart of Meise Botanic Garden greenhouse complex

Meise Botanic Garden, one of the world's largest botanical gardens, recently inaugurated the Green A... More

Six Bricolage Houses: An inventive model for urban renewal and housing design in Nantou, Shenzhen
18 Jun 2024 News
Six Bricolage Houses: An inventive model for urban renewal and housing design in Nantou, Shenzhen

ARCity Office embarked on a project that would establish a new typology of “bricolage architec... More

BYRÓ architekti’s charred wood-clad garden pavilion in Prague reimagines the mundane garden shed
17 Jun 2024 News
BYRÓ architekti’s charred wood-clad garden pavilion in Prague reimagines the mundane garden shed

Prague-based BYRÓ architekti has completed a small and contemporary charred wood-clad garden... More