Powerhouse Arts, New York
© Iwan Baan
Product Spec Sheet

ElementBrandProduct Name
Interior LightingLitelab
Interior LightingChelsea Lighting
FlooringGrayfox Flooring
FlooringHudson Furniture
Architectural MillworkPGS Millwork
Interior MetalworksTetra

Product Spec Sheet
Interior Lighting
by Litelab
Interior Lighting
Flooring
Flooring
Architectural Millwork
Interior Metalworks
by Tetra

Powerhouse Arts, New York

Herzog & de Meuron as Architects

Powerhouse Arts is a not-for-profit manufacturing facility based in Gowanus and Red Hook, Brooklyn, New York, established to create a robust platform for art production and employment in the arts. Consisting of 170,000 square feet of workshop space for fabrication in wood, metal, ceramics, textile and print, the redevelopment project transforms an existing, derelict structure on a contaminated site into a hub for artists, fabricators and other workers and ensures that the industrial legacy of the site will extend into the next century. Reimagining a 115-year-old power plant as a modern production facility, the project aims to maintain a manufacturing presence in a historically industrial part of Brooklyn. By preserving, restoring, and reconstructing essential elements of the original power station, the project strengthens the building’s industrial character and its relationship to the immediate urban context.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

The project is situated along the Gowanus Canal, a natural low point between the neighborhoods of Red Hook and Carroll Gardens to the west and Park Slope to the east. In 1904, the Brooklyn Rapid Transit Power Station, designed by Thomas Edward Murray, was completed on the site to serve the expanding transit system of Brooklyn. Decommissioned in the 1950s, half of the original structure – the Boiler House – was demolished, leaving the Turbine Hall to stand by itself. In the late twentieth century, the remaining structure became a destination for local graffiti artists, and it earned the nickname of “The Batcave.” Subsequently, the Gowanus Canal was designated a Superfund site in 2010 by the United States Environmental Protection Agency, identifying it as a candidate for remediation. Prior to the start of construction, the site contamination was resolved through completion of the New York State Brownfield Cleanup Program. In April 2016 – after an initial selection process that included a concept design for the site – Herzog & de Meuron was appointed as design consultant for the project.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

A mix of storage sheds, warehouses, and mixed-use, commercial buildings, the neighborhood is rapidly gentrifying. The existing building is set back from the edge of the Gowanus Canal to the west and bound at the north by First Street, at the south by Second Street, and at the east by a large storage building along Third Avenue. The scale of the Turbine Hall and its location atop relatively high ground give it a visual prominence in the neighborhood.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

The industrial landscape and history of the site play a pivotal role in the design proposal. It reinterprets the historic Boiler House by reinstating its mass and re-establishing its relationship with the existing Turbine Hall. The Turbine Hall is preserved – stabilized and strategically repaired – and its historical layers are integrated into the new manufacturing facility.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

The reinstated Boiler House bears on the existing, historic foundations, minimizing further site excavations. Its concrete façade responds to the existing masonry shell of the Turbine Hall and provides a durable and straightforward envelope for the addition. The exposed structure at the interior, comprising concrete columns and slabs, provides flexible spaces for workshop use. The historic, punched openings of the Turbine Hall are incorporated into the Boiler House envelope, and the openings of both buildings are filled with new windows.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

Atypically for an industrial project, the respective fabrication shops are stacked vertically with the disciplines requiring the most clear height and best access to the loading areas – that is, the metal and wood workshops – located on the ground floor, while the disciplines with the most stringent exhaust requirements – print, textile and ceramics – are located at the top floors of the Boiler House. Adhering to the best practices of industrial hygiene (refined through consultation with several specialists), a large amount of air is exhausted from the building to ensure contaminates from the manufacturing processes do not adversely affect the interior work environment. To that end, the workshops share a common, large vertical service wall that also contains the vertical circulation elements, stairs and elevators, as well as the restroom plumbing stack. The consolidation of these vertical elements between the existing and the new building provides additional lateral, structural stability for both buildings and creates the flexibility required for workshop programming within the remainder of the Boiler House floor slab. Two large bulkhead volumes at the roof express the primacy of the mechanical, electrical, plumbing, and fire protection systems in the project and recall the historic smokestacks of the original Boiler House building. They also illustrate the resiliency of the facility, as no equipment has been installed at the base of the building given the potential for flooding and sea level rise in the future.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

To the west of the project along the Gowanus Canal, a forecourt provides flexible outdoor work and storage space as well as loading for material deliveries. To the east of the project, closer to the approach to the site from public transit, a new opening into the masonry envelope of the Turbine Hall serves as the primary public entrance. Upon entering the building, the visitor is confronted with the juxtaposition of historic details – concrete vaults, brick chases, and glazed tilework – residual graffiti and the new architectural elements. A large, concrete shear wall forms a vertical space beyond the entrance lobby and a metal stair draws attention upward to the grand hall, the main public feature within the building. The entire upper level of the Turbine Hall building preserves the original spatial composition of the historic structure, exposing the refurbished, steel trusses overhead, and providing a multifunctional space for exhibitions and events. An adjacent, double-height volume in the Boiler House serves as the intersection of the public and workshop functions in the building, providing additional room for exhibitions, events, staging, and assembly.

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

Team:

Client: Powerhouse Arts, Brooklyn

Client Representative: Colliers International

Partners: Jacques Herzog, Pierre de Meuron, Ascan Mergenthaler (Partner in Charge)

Project Team: Philip Schmerbeck (Associate, Project Director), Jack Brough (Project Manager, SD - CA), Raha Talebi (Project Manager, Competition - Pre-SD) Farhad Ahmad, Bruno de Almeida Martins, Iwona Boguslawska, Christopher Cornecelli, Lasse Deichmann, Muriz Djurdjevic, Nazli Ergani, Florian Frank, Fabiola Guzman-Rivera, Josh Helin, Magnus Overby, Pedro Peña Jurado, Martin Jonathan Raub, Rebecca Roberts, Emma Thomas, Pimchanok Wangveeramit, Samuels Zeif

Design Consultant: Herzog & de Meuron Basel Ltd

Executive Architect: Platt Byard Dovell White Architects

Structural Engineering: Robert Silman Associates Structural Engineers

MEP Engineering: Buro Happold Engineering

Cost Consulting: Stuart-Lynn Company

Landscape Architect: (Waterfront) Ken Smith Workshop

Concrete Consulting: Reg Hough Associates, Freehold

Facade Consulting: Eckersley O'Callaghan

Lighting Consulting: Tillotson Design Associates

Traffic Consulting: Philip Habib and Associates

Civil Engineering: Philip Habib and Associates Geotechnic Consulting: Langan Engineering and Environmental Services

Environmental Engineerin: Roux Associates, Islandia

Fire Protection Consulting: Cosentini Associates

Vertical Circulation Consulting: Van Deusen and Associates

Building Code Consulting: Metropolis Group

Industrial Hygiene: Arts, Crafts and Theater Safety, Inc.

Acoustic Consulting: Longman Lindsey

Masonry Restoration (implementation): Eugene Architecture

Surveyor: Building Survey Corporation, Carle Place

Surveyor: Perfect Point Land Surveying

Theatre Consulting: Charcoalblue

Concrete Works: Structure Tech

Steel Construction: Maspeth Welding

Facade Restoration: New Roc Contracting, Fort Lee

Aluminum Windows: STNY Curtainwalls

Excavation & Environmental Remediation: Darcon Construction, Elmont

Heating, Ventilation, Air Conditioning: Eastern Air Inc., Brownstown, Pennsylvania

Plumbing Works: Donato Plumbing, Inc, Brooklyn

Electrical Installations: Centrifugal Electric, LLC

Photographer: © Iwan Baan

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto

Materials Used:

Lighting Fixtures: Chelsea Lighting

Lighting Fixtures Litelab, Buffalo

Masonry: Bunlin LLC

Architectural Millwork: PGS Millwork, Inc.

Interior Metalworks: Tetra, Staten Island

Floor Finishes Grayfox Flooring

Metal Doors: Long Island Fireproof Door

photo_credit Albert Vecerka/Esto
Albert Vecerka/Esto
Products Behind Projects
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More