Norwegian National Opera and Ballet

Applied products
View all applied products

The dividing line between the ground and the water is both a real and a symbolic threshold and this threshold is realized as a large wall on the line of the meeting between land and sea, Norway and the world, art and everyday life. The opera house stands apart due to its size and aesthetic expression.


More from the architect:


Architect’s description The opera house is the realisation of the winning competition entry. Four diagrams, which were part of the entry, explain the building’s basic concept. ”The wave wall” Opera and ballet are young art forms in Norway. These art forms evolve in an international setting. The Bjørvika peninsula is part of a harbour city, which is historically the meeting point with the rest of the world. The dividing line between the ground ’here’ and the water ‘there’ is both a real and a symbolic threshold. This threshold is realised as a large wall on the line of the meeting between land and sea, Norway and the world, art and everyday life. This is the threshold where the public meet the art. ”The Factory” A detailed brief was developed as a basis for the competition. Snøhetta proposed that the production facilities of the opera house should be realised as a self-contained, rationally planned ‘factory’. This factory should be both functional and flexible during the planning phase as well as in later use. This flexibility has proved to be very important during the planning phase: a number of rooms and room groups have been adjusted in collaboration with the end user. These changes have improved the buildings functionality without affecting the architecture. ”The Carpet” The competition brief stated that the opera house should be of high architectural quality and should be monumental in its expression. One idea stood out as a legitimation of this monumentality: the concept of togetherness, joint ownership, easy and open access for all. To achieve a monumentality based on these notions we wished to make the opera accessible in the widest possible sense, by laying out a ‘carpet’ of horizontal and sloping surfaces on top of the building. This carpet has been given an articulated form, related to the cityscape. Monumentality is achieved through horizontal extension and not verticality. The conceptual basis of the competition, and the final building, is a combination of these three elements – The wave wall, the factory and the carpet. Urban situation The opera house is the first element in the planned transformation of this area of the city. In 2010 the heavy traffic besides the building will be moved into a tunnel under the fjord. Due to its size and aesthetic expression, the opera house will stand apart from other buildings in the area. The marble clad roofs cape forms a large public space in the landscape of the city and the fjord. The public face of the opera house faces west and north – while at the same time, the building’s profile is clear from a great distance from the fjord to the south. Viewed from the Akershus castle and from the grid city the building creates a relationship between the fjord and the Ekerberg hill to the east. Seen from the central station and Chr. Fredriks sq., the opera catches the attention with a falling which frames the eastern edge of the view of the fjord and its islands. The building connects city and fjord, urbanity and landscape. To the East, the ‘factory’ is articulated and varied. One can see the activities within the building: Ballet rehearsal rooms at the upper levels, workshops at street level. The future connection to a living and animated new part of town will give a greater sense of urbanity.

Project credits

Architects
Manufacturers
Interior Architects
Manufacturers
Manufacturers
Client

Product spec sheet

Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers

THE NEW OPERA HOUSE

The new building is a very complex with a high quality finish. The main hall includes a large presence of wood and excellent acoustics. Frapont participated in the construction of the building with two contracts: flooring and acoustic elements (manufacture, supply and installation of all wood floors of the building and part of the acoustic wall coverings).


More from the manufacturer:


The new Oslo Opera building is a very complex with a high quality finish. The main hall has a capacity of 1,400 seats and includes a large presence of wood and excellent acoustics. Frapont participated in the construction of the New Oslo Opera building with two contracts: flooring and acoustic elements (manufacture, supply and installation of all wood floors of the building and part of the acoustic wall coverings)


Technical Accomplishments:


The oak wood used in the work was of European origin.


1 º FLOORING


1.1 Structure of fir tree wood and plywood 30mm double layer installed over existing metal supports. On the structure of wood a solid hardwood parquet oak treated with ammonia was installed in 500x70x22mm slats and finished with 3 coats of vegetable oil. A total of 2000m ² in the main room, divided between tiers, balconies, indoor mobile platforms and side access.


1.2 Directly on concrete construction, a total of 2,500 m² of floor boards and stair treads in external access galleries to the main room were glued. The parquet in this case did not contain ammonia, but was a natural finish with 3 coats of vegetable oil.


1.3 Also in offices, vip room and living room a natural solid oak parquet finished with three coats of vegetable oil was used and glued directly to concrete work. There were a total of approximately 1,000 sqm.


1.4 In Small- Chamber or Chamber Hall were installed over the existing metal structure, the structures of balconies and stairs with fir tree wood and plywood double layer of 30mm. For the finish of these and for the stalls was used a Swedish pine parquet ( Flanders pine ) of section 70x22mm black tinted and cut into strips of various lengths. ( 1.200m ² )


1.5 In choir room total of 300m ² stands were formed with a structure in spruce wood and plywood, installed directly on concrete, and finishing with European oak parquet three layer of vegetable oil and cut into sections of 500x70x22mm .


1.6 Test Chamber Orchestra: the ground was installed on a structure in wood of fir tree over a layer of acoustic insulation, plywood board and a final layer of parquet U.S. Oregon pine finished with three coats of vegetable oil. ( 300m ² )


1.7 The Ballet Rehearsal rooms and multipurpose rooms, gathering a total of approximately 4,000 sqm surface, we installed over the concrete a layer of acoustic insulation, plywood board, three layers of cross battens and a final layer of Swedish pine parquet ( flanders ) natural finish ( without any treatment) All this was prepared as a solid base in order to accommodate a special carpet for dancing.


2nd ACOUSTIC ELEMENTS


2.1 A total of 1,400 units of elements created with different ways to achieve varying acoustic approximation. These elements were made by MDF 16mm and 19mm panels, forming cubes of different shapes and dimensions, with an internal structure of fir tree wood, mineral wool acoustic fleece. The elements were finished with a lacquered in various colours depending on the type of room that concerned (dance hall, rehearsal hall, ...)


2.2 In the pit orchestra of the Main Hall there are special acoustic elements. They were formed by movable panels with black lacquered metal structures, and with internal moving panels by a rotating shaft with a perimeter metal lacquered, lacquered MDF panels, rock wool and acoustic fabric as the final element. (26 units)


2.3 In the Rehearsal Room and Orchestra the desired acoustics is achieved with the coating of all perimeter walls of the room by moving black lacquered metal structure, rock wool and acoustic fabric, finishing on the outside with lacquered MDF slats with different sections but always installed from floor to ceiling. ( 900m ² )


2.4 Among other elements, Frapont also executed works as manhole covers in stainless steel and plywood, facilities channels in plywood and stainless steel, and baseboards of corridors and rooms in different finishes that were required under the place where they were be installed . Were installed approximately 6.000ml stainless steel skirting and 2,000 ml of wood finish skirting( MDF, European oak , pine Swedish ...)

Brand description
FRAPONT is a company with over 75 years experience in the field of carpentry and wood decoration that unites traditional craftsmanship with contemporary trends. We have a technical team of experts in wood that develops large-scale architectural projects. We bring our know-how with constructive alternatives, technical and economic, in we look for the optimal solution for our client to provide a full service of manufacture and installation. At FRAPONT we have grown and developed year after year, in the process perfecting our work day by day, but without ever losing sight of the real essence of our labors. We are an engineering company specializing in wood that gives technical solutions showing commitment to your ideas of quality and deadlines.
Products applied in Commercial , Educational

OPERAHOUSE IN OSLO

The building is a combination of three elements – The wave wall, the factory and the carpet, and the building connects city and fjord, urbanity and landscape


More from the manufacturer:


”The wave wall” Opera and ballet are young artforms in Norway. These artforms evolve in an international setting . The Bjørvika peninsula is part of a harbour city, which is historically the meeting point with the rest of the world.. The dividing line between the ground ’here’ and the water ‘there’is both a real and a symbolic threshold. This threshold is realised as a large wall on the line of the meeting between land and sea, Norway and the world, art and everyday life. This is the threshold where the public meet the art.


”The Factory” A detailed brief was developed as a basis for the competition. Snøhetta proposed that the production facitities of the operahouse should be realised as a self contained, rationally planned ‘factory’. This factory should be both functional and flexible during the planning phase as well as in later use. This flexibility has proved to be very important during the planning phase: a number of rooms and romm groups have been adjusted in collaboration with the end user. These changes have improved the buildings functionality without affecting the architecture.


”The Carpet” The competion brief stated that the operahouse should be of high architectural quality and should be monumental in it’s expression. One idea stood out as a legitimation of this monumentality: The concept of togetherness, joint ownership, easy and open access for all. To achieve a monumentality based on these notions we wished to make the opera accessible in the widest possible sense, by laying out a ‘carpet’ of horizontal and sloping surfaces on top of the building. This carpet has been given an articulated form, related to the cityscape. Monumentality is achieved through horizontal extension and not verticality.


The conceptual basis of the competition, and the final building, is a combination of thes three elements – The wave wall, the factory and the carpet.


The operahouse is the first element in the planned transformation of this area of the city. In 2010 the heavy traffic beside the building will be moved into a tunnel under the fjord. Due to its size and aesthetic expression, the operahouse will stand apart from other buildings in the area. The marble clad roofscape forms a large public space in the landscape of the city and the fjord.


The public face of the operahouse faces west and north – while at the same time, the building’s profile is clear from a great distance from the fjord to the south. Viewed from the Akershus castle and from the grid city the building creates a relationship between the fjord and the Ekeberg hill to the east. Seen from the central station and Chr. Frederiks sq. the opera catches the attention with a falling which frames the eastern edge of the view of the fjord and its islands. The building connects city and fjord, urbanity and landscape.

Brand description
Danish design is about the enduring power of craft, style, sustainability and honest materials. For half a century, Vola has epitomised this approach, making taps, showers and accessories that combine simple, elegant shapes with innovation in form and function. Vola has been involved in some of the world’s best-known contemporary buildings since 1968, when Vola owner Verner Overgaard invited celebrated architect Arne Jacobsen to collaborate. The result was the birth of the iconic Vola 111 shape, the company’s first product, designed for the National Bank of Denmark. It attracted immediate international acclaim, combining simple circular and linear forms with revolutionary plumbing hidden in its walls – Vola had, in fact, created the first fully integrated, single lever mixer tap. By setting this benchmark for minimal contemporary design and high standards of process and manufacturing, Vola is often imitated but never matched. Today Vola products are internationally recognised as true design icons. For five decades, expert knowledge and specialist skills have come together to create and innovate. The company places such emphasis on craftsmanship and longevity that some of its earliest products are still fully operational today. Vola is both the original modern tap designer and a multi award-winning brand that brought contemporary Danish design to the home.
Products applied in Commercial , Cultural , Landscape , +2

The New Opera House

The New Opera House
Ivan Brodey / Statsbygg

Statsbygg was commissioned to plan and execute the new opera house. It has hosted and informed more than 70 000 people on various aspects of the building and also it has cooperated closely with societies for the disabled during the entire construction period. They have been given access to drafts and provided several suggestions that have been taken into account. One example is “talking signs”, which guide the blind and visually impaired.


More from the client:


In July 1999 Statsbygg was commissioned to plan for a new opera house. In the year 2000 an open architect competition was held which attracted the largest number of entries of any such competition in Norway. An international jury selected the architecture firm Snøhetta as the winner.


The opera house is 38 500 square metres in size and has close to 1000 rooms. The house is divided into three main sections: the audience section, the rehearsal and administration section and the workshop section. The house has three stages: the Main Stage with approximately 1400 seats, Scene 2 with up to 440 seats and Rehearsal Stage 1 with 200 seats. The workshop section with paint workshop, carpentry workshop and smithy was brought into use on 1 September 2007, six months ahead of the original plan.


Execution A total of 60 building contracts have been supervised. The project management organization has changed according to requirements, but has on average consisted of 20 individuals and project director Roar Bjordal from Statsbygg. In addition, the project organization has had 30 associated foremen. During the entire project period there has been close cooperation with The Norwegian Opera & Ballet. The opera house is a very complex building and it has been demanding for everyone who has participated in the project. The market situation in recent years has also presented a challenge; it has been difficult to attract bids, and the prices offered have frequently been well above budget. This has necessitated certain simplifications and close control of finances in order to complete the project within budgetary constraints.


The chandelier In 2007 it has largely been the technical contracts that have been carried out. That is to say electrical, heating, ventilation and plumbing and not least theatre technology. In addition the final decoration work has been completed. The audience seating has been installed and the chandelier in the Main Stage has been hoisted into place. It was designed and built in cooperation between Snøhetta, Eidskog Mekaniske Verksted and Hadeland Glassworks and has a diameter of seven metres.


In 2007 the final stones were laid down on the plaza. Finally, the 36 000 pieces in the marble and granite jigsaw were completed. All were ready-cut in various shapes and sizes. The foyer also has marble flooring.


Theatre technology The building contains advanced stage technology, particularly on the Main Stage and Stage 2. The Main Stage has 16 elevators that can be moved up and down independently. It has a moveable rotating stage, two side stages and a background stage. Stage 2 will also be equipped with advanced theatre technology and a very advanced electro-acoustic system.


Achievement of goals The main goal for the opera house project was that the building should manifest itself as an important monument that both highlights Norway as a nation of culture and the Norwegian Opera & Ballet’s significance in The Norwegian culture and society. The huge interest the project has generated during the construction period indicates that this goal will be achieved. During the construction period Statsbygg has hosted and informed more than 70 000 people on various aspects of the building.


Facilities for the disabled Statsbygg has cooperated closely with societies for the disabled during the entire construction period. They have been given access to drafts and provided several suggestions that have been taken into account. One example is “talking signs”, which guide the blind and visually impaired. The stages will be equipped with induction loops and the Main Stage has a total of 72 possible wheelchair spaces.

Brand description
Statsbygg is a Norwegian government agency that manages central parts of the real estate portfolio of the Government of Norway. This includes 2.7 million square meters in 2,350 buildings, of which 115 are located abroad. The portfolio includes office buildings, heritage sites, campuses, operational facilities and other buildings. Statsbygg also manages the Global Seed Vault in Svalbard. The agency has at any time about 200 construction projects under way, completing about 10-20 new structures each year. Statsbygg has 860 employees. The head office is situated in Oslo and there are regional offices in Oslo, Porsgrunn, Bergen, Trondheim and Tromsø.
Products applied in
Not Available yet

Operahuset

Operahuset
Erik Berg

The angular architecture seemingly arising from the waters of Oslo Fjord have become known around the world and are considered the keystone signature of the Oslo Opera House. The building distinguishes itself as the open space located on the roof of the building.


More from the tenant:


THE PATH TO A NEW OPERA HOUSE


By the time the Norwegian National Opera & Ballet was finally able to invite the public into an opera house of its own in 2008, the wish to have a dedicated opera and ballet venue in Norway had been debated for more than a century. An important step on the way to realising it was taken in 1957 with the formation of the Norwegian National Opera and the appointment of the world-famous opera singer Kirsten Flagstad as its first director. While the opera and ballet companies rehearsed and performed in Folketeatret at Youngstorget in Oslo, a painstaking political process was playing out which eventually culminated in the year 2000 with Parliamentary approval to build a new opera house. It was to be sited in Oslo’s old Bjørvika harbour area as the first building in a comprehensive urban development project for the area.


THE OPERA HOUSE’S ARCHITECTURE


Since the opening, pictures of the angular architecture seemingly arising from the waters of Oslo Fjord have become known around the world and today are considered the keystone signature of the Oslo Opera House. This was precisely the intention of the firm of architects behind this iconic design, Snøhetta, which wanted to make the roof a platform accessible to all and in so doing create a new public space in the centre of Oslo. A parallel wish was to create a new landscape that would draw together the natural beauty of Oslo Fjord and the city.


In the foyer the public is met by a light, open space with a large, undulating oakwood wall. Behind this wall are the opera house’s three performance halls, with the Main House forming the heart of the building. Acoustic requirements determined the interior design of the Main House, and the combination of timbre and tonal possibilities and the dark, golden woodwork can be said to have transformed the Main House into a singularly outsized wooden instrument.


Oslo Opera House also has two smaller stages - the Second House and the Studio. Advanced theatre technology, specially built workshops, and rehearsal rooms for dance, song, orchestra and chorus make Oslo Opera House a modern, fully integrated performance venue. Every step in the process of creating performance art can be completed here.


BACKSTAGE From north to south through the Opera House runs a high, inbuilt structure referred to as Opera House Street that separates the stages and the public areas from the production side where the rehearsal rooms, song and ballet studios, workshops and offices are located. Architecturally, the production side is separated from the public areas through the use of functional materials and right angles. However, the common element is openness. Visitors who wander around the Opera House can look through the big glass windows and catch a glimpse of activity in the scene painting room, sewing room, and hat and mask section. In this way the Opera House is open and accessible and offers the public an insight into its inner workings.


MATERIAL USED The Snøhetta architects used three main materials in designing Oslo Opera House: stone, wood and metal. The principal stone used in the construction is the characteristic white marble from Carrara in Italy. The wood used in the foyer, public galleries and the Main House is oak, while the metal facades on the roof are aluminium. In addition, the design makes extensive use of large glass facades.


DECORATIVE ARTWORK Oslo Opera House features eight arts projects in which 17 different artists were involved. The majority of the artwork is more or less integrated into the building, such as the stage curtain Metafoil by Pae White and the four predominantly white-lit installations in the wardrobe area of the foyer by Olafur Eliasson called The Other Wall. Other artworks not integrated into the architecture include Monica Bonvicini’s sculpture She Lies, anchored in the waters of the harbour outside the Opera House.


OSLO OPERA HOUSE IN THE OPERA HOUSE TRADITION


The Oslo Opera House joins a long opera house tradition. How has opera house architecture developed? And what are the differences and similarities between the various opera houses?


The origins of the opera house Opera is a composite art form in which many types of performance art are merged into one. Therefore opera houses are built to specialised requirements in terms of stage areas, daily operations and audience functions. The opera singer first appeared around 1600, inspired by ancient Greek and Roman theatre. The first opera halls were built by the nobility in their castles and palaces, and were modelled on ancient semi-circular outdoor amphitheatres. One example is Teatro Farnese in Parma, which was completed in 1618. Here, a new invention was also incorporated: a hole in the wall that served as a stage opening, with a curtain in front of it that could be raised and lowered.


OPERA HALL AND STAGE


The first public opera house, Teatro di San Cassiano, opened in Venice in 1637. Very soon the horseshoe-shaped opera hall evolved, with balconies and galleries on several levels. This ensured good acoustics and good views for hundreds of people at the same time, while lavishly decorated timber walls were used to create irregular surfaces that reflected, absorbed and spread the sound throughout the hall.


As with the new opera houses in Helsinki, Gothenburg and Glyndebourne in southern England, the Oslo Opera House opted for the traditional horseshoe design for the main performance hall. The wall surfaces, shape and size are all based on the old Semper Opera in Dresden, whose hall is especially renowned for its excellent acoustics.


In both older and newer opera houses it has become customary to build smaller secondary halls, often based on a black box design (basically a simple, right-angled flexible hall). Oslo Opera House also has two smaller halls, where the stage solutions and audience placing are changeable. The performance space known as the Studio can certainly be called a black box, while the Second House can be considered a technically advanced secondary performance hall.


Advanced stage technology was in existence as early as the 17th century, with moveable floor surfaces, sliding walls and sets that could be lowered onto the stage. These technologies are also found in modern-day opera houses, and today modern stage technology also includes lighting effects from hundreds of floodlights and spotlights. Up until the 20th century decorative elements consisted mainly of painted backdrops, but since then three-dimensional sets have become the norm, which require larger stage and storage space


AUDIENCES


For many centuries the opera house has served as an important social meeting place where members of the audience would talk, eat and drink in the opera hall during the performance. In the 19th century the public area began to be expanded with the introduction of palatial halls, stairways and foyer areas - a well-known example of this is the old Palais Garnier opera in Paris. In the Oslo Opera House the box office, cloakrooms, serving locations and mingling areas account for over one quarter of the total floor area of the building, which can accommodate up to 2,000 visitors.


OPERAHOUSE - THE BUILDING AND ITS SURROUNDINGS From keeping the early opera houses hidden in the palaces of the nobility or behind modest facades in narrow streets, in the 19th century resplendent, free-standing opera buildings began to be built as symbols of the city and the nation. These venues gave performances of spoken theatre, ballet and opera – just as the Norwegian National Theatre does here in Oslo.


The Sydney Opera House in Australia was completed in the 1970s and has since become world famous for its iconic architecture and harbourside location. Inspired by this building, several visually striking opera houses have been built on large sites with open spaces in waterfront locations. Oslo Opera House has followed this trend, but distinguishes itself in that the “open space” is located on the roof of the building.

Brand description
Products applied in
Not Available yet
References Snøhetta

Opera House Oslo

The beige DLW Linoleum Marmorette forms in the tailors’ workshop a subdued background for the colorful costumes. In other areas one can find DLW Vinyl Favorite in ash crome.


More from the manufacturer:


In the building with an overall area of almost 40,000 square metres there are more than 1,000 rooms, among them rooms for rehearsal and work as well as workshops for the stage designers, costume makers and carpenters. These functionally designed administration and production rooms of the opera are in the eastern part of the building with a view inland. The beige DLW Linoleum Marmorette forms in the tailors’ workshop a subdued background for the colourful costumes. In other areas you can also find DLW Vinyl Favorite in ash crome.

Brand description
DLW Flooring the specialist in flooring products. DLW Flooring is one of Europe’s leading manufacturers of floor coverings, with worldwide sales offices from Germany to Dubai. For over 130 years, the DLW brand has stood for top-quality, innovative floor coverings which are "Made in Germany". Manufactured in modern factories in Germany we are able to guarantee flooring products of the highest quality. We guide and support our customers with profound knowledge, professional service and a lot of commitment. Together with architects and designers we continue to develop our products - so that you can rely on DLW also in the future. -headquarter in Bietigheim south of Germany -780 highly qualified employees -Linoleum Produktion since 1882 in Delmenhorst -Flooring compentence for your project in healthcare, education, retail, office or hotel wide range of exciting high-quality flooring systems -since 2015 again under quality brand DLW
Products applied in
Not Available yet

Oslo Opera House

Oslo Opera House
Jiri Havran

Poltrona Frau executed 1,800 seats designed by the architect. The studio choosed the custom-made wenge-tinted oak and bright orange, 100 percent mohair velvet product. A screen fitted into the seat back displays the lines of the libretto during performances. For the multipurpose hall, Poltrona Frau created a different type of seat with a more lightweight design and an open side made with a wire-drawn aluminum structure.


More from the  interior architect:


In 2007, Poltrona Frau executed 1,800 seats designed by Snøhetta to the new opera house in Oslo. Its design blends Scandinavian style with exclusive comfort. The Norwegian studio chose custom-made wenge-tinted oak and bright orange, 100 percent mohair velvet. A screen fitted into the seat back displays the lines of the libretto during performances. The main auditorium posed a number of functional challenges: the floor had a double recline, both vertical and lateral, and the entire design had a semicircle layout. For the multipurpose hall, which features a floor with mobile steps, Poltrona Frau created a different type of seat with a more lightweight design and an open side made with a wire-drawn aluminium structure.


Brand description
The Poltrona Frau Group is an international leader in the high-end furniture sector with renowned brands such as Poltrona Frau, Cassina, Cappellini. The strength of the Poltrona Frau Group lies in focus- ing on diversity and complementarity at the same time. A multicultural group featuring high-level business profiles that have contributed to the success of Italian design. Industrial and produc- tion synergies, innovation and experimentation, all with the knowledge of a life style that has never been as diversified as today. The adventure of PFG Contract Division started in the 1930 with famous cruise ships such as the Andrea Doria, the Raffaello and the Michelangelo. PFG Contract sharpened its sartorial skills on these projects and become a trailblazer in the concept of designing public venues. Its approach combined manual skill and expert craftsmanship with technology and industrial scale production processes. It was not long before more new orders came streaming in, leading to it complete assignments on hundreds of hotels, bars, restaurants and residences. It thrived on the stimulating challenge presented by each one. They also provided PFG Contract with the opportunity to display its mastery in the art of high-end carpentry and leatherwork along with its expertise in working with fabrics, metals and all other types of materials. PFG Contract’s long experience makes it highly qualified to work in historical environments but it is equally at ease with the most advanced, experimental and forward looking architectural projects.
Products applied in Cultural , Educational , Recreational , +1
Share or Add Norwegian National Opera and Ballet to your Collections